H.R. 7487

Rural Jobs and Hydropower Expansion Act

Official summary

No official summary yet.

Text of the bill

Collapse all
Sec. 1. Short title Since introduced

This Act may be cited as the Rural Jobs and Hydropower Expansion Act.

Sec. 2. Amendments to Reclamation Project Act Changed · Aug 27

Section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c); 53 Stat. 1194) is amended—

(1) by striking the subsection designation and inserting the following:

Text this section adds to the law

(c) Furnishing water to municipalities; sale of electric power; lease of power privileges

(2) in paragraph (1), by striking small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs and inserting hydropower using all Bureau of Reclamation facilities;

(3) in paragraph (2)(A)—

(A) by striking applicable transferred conduit and inserting applicable transferred works facility;

(B) by striking applicable reserved conduit and inserting applicable reserved works facility; and

(C) by striking power privilege offer for a small conduit and inserting power privilege offer for the;

(4) in paragraph (3), by striking small conduit and inserting applicable;

(5) in paragraph (4), by striking small conduit hydropower;

(6) in paragraph (6)—

(A) by inserting , or the management of Bureau of Reclamation facilities specially authorized for hydropower generation before , as water used;

(B) by striking conduit before hydropower generation;

(C) by striking shall be deemed incidental to inserting shall be deemed secondary to; and

(D) by striking transferred conduit and inserting transferred works facility;

(7) in paragraph (7), by striking conduit;

(8) in paragraph (8)—

(A) by inserting (referred to in this section as an authorization) before issued by the Federal Energy Regulatory Commission;

(B) by striking August 9, 2013, and inserting the date of the enactment of the Rural Jobs and Hydropower Expansion Act; and

(C) by adding at the end Any authorization issued by the Federal Energy Regulatory Commission with respect to a project shall remain in place until such authorization becomes inactive. As allowed by the Federal Energy Regulatory Commission, an authorization may be renewed and remain active. Once the authorization becomes inactive, project site jurisdiction shall shift to the Bureau of Reclamation exclusively.;

(9) by redesignating paragraph (9) as paragraph (10);

(10) by inserting after paragraph (8) the following:

Text this section adds to the law

(9) Nothing in this section shall expand or otherwise amend the Bureau of Reclamation lease of power privilege authorities outside the project boundary.

; and

(11) in paragraph (10), as so redesignated—

(A) by striking subparagraphs (A), (C), (D), and (E);

(B) by redesignating subparagraph (B) as subparagraph (A); and

(C) by adding at the end the following:

Text this section adds to the law

(B) Reserved works facility. The term reserved works facility means those facilities owned by the Bureau of Reclamation where the Bureau of Reclamation has retained responsibility for carrying out operation and maintenance activities.

(C) Transferred works facility. The term transferred works facility means a project facility where the operations and maintenance of that facility is carried out by a non-Federal entity under the provisions of a formal operations and maintenance transfer contract.