H.Con.Res. 14
Establishing the congressional budget for the United States Government for fiscal year 2025 and setting forth the appropriate budgetary levels for fiscal years 2026 through 2034.
Sponsor: Jodey C. Arrington · 0 cosponsors
Official summary
Written by the Congressional Research Service.
This concurrent resolution establishes the congressional budget for the federal government for FY2025, sets forth budgetary levels for FY2026-FY2034, and provides reconciliation instructions for legislation that increases or decreases the deficit and increases the statutory debt limit by specified amounts.
The resolution recommends levels and amounts for FY2025-FY2034 for
- federal revenues,
- new budget authority,
- budget outlays,
- deficits,
- debt subject to limit,
- debt held by the public, and
- the major functional categories of spending.
The resolution includes reconciliation instructions that direct 11 House committees to submit legislation that will increase or decrease the deficit over FY2025-FY2034 and increase the statutory debt limit by specified amounts. The committees must submit the legislation to the House Budget Committee by March 27, 2025.
(Under current law, reconciliation bills are considered by Congress using expedited legislative procedures that prevent a filibuster and restrict amendments in the Senate.)
In addition, the resolution establishes a reserve fund that allows certain adjustments to committee allocations and other budgetary levels to accommodate reconciliation legislation.
The resolution also requires the maximum deficit increase permitted by the reconciliation instruction for the House Ways and Means Committee ($4.5 trillion in the resolution) to be reduced if the proposals submitted by certain committees do not achieve a total of at least $2 trillion in net deficit reduction (or increased if more than $2 trillion in deficit reduction is achieved).
Finally, the resolution sets forth budget enforcement procedures that address issues such as adjustments to committee allocations and the budgetary treatment of the discretionary administrative expenses for the Social Security Administration and the U.S. Postal Service.
Text of the bill
I Recommended levels and amounts
A Budgetary levels in both Houses
Where this section came from
-
Feb 18, 2025 · Reported in House
-
Apr 5, 2025 · Engrossed Amendment Senate S.Amdt. 2035: To establish a deficit-neutral reserve fund relating to protecting Medicare and Medicaid. Official page › S.Amdt. 1717: In the nature of a substitute. Official page › On the Motion to Proceed — Motion to Proceed Agreed to, 52–48 · Roll Call 169On the Amendment — Amendment Agreed to, 51–48 · Roll Call 170On the Amendment — Amendment Rejected, 46–53 · Roll Call 171On the Amendment — Amendment Rejected, 48–51 · Roll Call 172On the Amendment — Amendment Rejected, 47–51 · Roll Call 173On the Amendment — Amendment Rejected, 46–53 · Roll Call 174On the Amendment — Amendment Rejected, 48–51 · Roll Call 175On the Amendment — Amendment Rejected, 46–53 · Roll Call 176On the Amendment — Amendment Rejected, 48–51 · Roll Call 177On the Amendment — Amendment Rejected, 48–51 · Roll Call 178On the Amendment — Amendment Rejected, 5–94 · Roll Call 179On the Amendment — Amendment Rejected, 49–50 · Roll Call 180On the Amendment — Amendment Rejected, 48–51 · Roll Call 181On the Amendment — Amendment Rejected, 48–51 · Roll Call 182On the Amendment — Amendment Rejected, 49–50 · Roll Call 183On the Amendment — Amendment Rejected, 47–52 · Roll Call 184On the Motion — Motion Rejected, 49–50 · Roll Call 185On the Amendment — Amendment Rejected, 49–50 · Roll Call 186On the Amendment — Amendment Rejected, 48–51 · Roll Call 187On the Amendment — Amendment Rejected, 48–51 · Roll Call 188On the Amendment — Amendment Rejected, 49–50 · Roll Call 189On the Amendment — Amendment Rejected, 47–52 · Roll Call 190On the Concurrent Resolution — Concurrent Resolution Agreed to, 51–48 · Roll Call 191
… 3 unchanged passages …
(A) New budget authority, $
888
933
,
044
484
,000,000. (B) Outlays, $
883
909
,
821
629
,000,000.
Fiscal year 2026:
(A) New budget authority, $
913
901
,
263
220
,000,000. (B) Outlays, $
895
904
,
830
412
,000,000.
Fiscal year 2027:
(A) New budget authority, $
935
923
,
345
020
,000,000. (B) Outlays, $
913
911
,
493
956
,000,000.
Fiscal year 2028:
(A) New budget authority, $
956
944
,
694
111
,000,000. (B) Outlays, $
940
934
,
299
660
,000,000.
Fiscal year 2029:
(A) New budget authority, $
979
966
,
049
203
,000,000. (B) Outlays, $
950
942
,
598
419
,000,000.
Fiscal year 2030:
(A) New budget authority, $
1
989
,
002
212
,
337,
000,000. (B) Outlays, $
977
966
,
233
361
,000,000.
Fiscal year 2031:
(A) New budget authority, $1,
026
012
,
119
715
,000,000. (B) Outlays, $
996
984
,
535
795
,000,000.
Fiscal year 2032:
(A) New budget authority, $1,
050
036
,
408
723
,000,000. (B) Outlays, $1,
016
003
,
235
888
,000,000.
Fiscal year 2033:
(A) New budget authority, $1,
076
062
,
299
319
,000,000. (B) Outlays, $1,
050
037
,
728
888
,000,000.
Fiscal year 2034:
(A) New budget authority, $1,
101
087
,
659
382
,000,000. (B) Outlays, $1,
067
054
,
701
430
,000,000.
… 5 unchanged passages …
(A) New budget authority, $
64
61
,
270
716
,000,000. (B) Outlays, $
68
67
,
458
669
,000,000.
Fiscal year 2027:
(A) New budget authority, $
64
62
,
856
249
,000,000. (B) Outlays, $
68
66
,
013
456
,000,000.
Fiscal year 2028:
(A) New budget authority, $
66
63
,
169
512
,000,000. (B) Outlays, $
64
62
,
433
391
,000,000.
Fiscal year 2029:
(A) New budget authority, $
67
64
,
655
944
,000,000. (B) Outlays, $
65
62
,
177
832
,000,000.
Fiscal year 2030:
(A) New budget authority, $
69
66
,
175
408
,000,000. (B) Outlays, $
65
63
,
601
077
,000,000.
Fiscal year 2031:
(A) New budget authority, $
70
67
,
699
878
,000,000. (B) Outlays, $
66
64
,
643
002
,000,000.
Fiscal year 2032:
(A) New budget authority, $
72
69
,
220
343
,000,000. (B) Outlays, $
67
65
,
916
176
,000,000.
Fiscal year 2033:
(A) New budget authority, $
73
70
,
809
874
,000,000. (B) Outlays, $
69
66
,
332
517
,000,000.
Fiscal year 2034:
(A) New budget authority, $
75
72
,
431
435
,000,000. (B) Outlays, $
70
67
,
768
889
,000,000.
… 5 unchanged passages …
(A) New budget authority, $
43
41
,
056
345
,000,000. (B) Outlays, $
42
41
,
483
844
,000,000.
Fiscal year 2027:
(A) New budget authority, $
44
42
,
011
264
,000,000. (B) Outlays, $
43
41
,
166
923
,000,000.
Fiscal year 2028:
(A) New budget authority, $
44
43
,
881
099
,000,000. (B) Outlays, $
43
42
,
781
198
,000,000.
Fiscal year 2029:
(A) New budget authority, $
45
44
,
834
017
,000,000. (B) Outlays, $
44
42
,
611
887
,000,000.
Fiscal year 2030:
(A) New budget authority, $
46
44
,
835
980
,000,000. (B) Outlays, $
45
43
,
450
633
,000,000.
Fiscal year 2031:
(A) New budget authority, $
47
45
,
840
946
,000,000. (B) Outlays, $
46
44
,
405
551
,000,000.
Fiscal year 2032:
(A) New budget authority, $
48
46
,
853
922
,000,000. (B) Outlays, $
47
45
,
377
486
,000,000.
Fiscal year 2033:
(A) New budget authority, $
49
47
,
907
936
,000,000. (B) Outlays, $
48
46
,
391
460
,000,000.
Fiscal year 2034:
(A) New budget authority, $
50
48
,
997
985
,000,000. (B) Outlays, $
49
47
,
436
466
,000,000.
… 5 unchanged passages …
(A) New budget authority, $
40
39
,
172
958
,000,000. (B) Outlays, $44,
518
514
,000,000.
Fiscal year 2027:
(A) New budget authority, $
43
34
,
579
098
,000,000. (B) Outlays, $52,
928
768
,000,000.
Fiscal year 2028:
(A) New budget authority, $
44
34
,
493
825
,000,000. (B) Outlays, $
52
51
,
542
623
,000,000.
Fiscal year 2029:
(A) New budget authority, $
45
35
,
633
770
,000,000. (B) Outlays, $
51
48
,
237
582
,000,000.
Fiscal year 2030:
(A) New budget authority, $
44
33
,
014
946
,000,000. (B) Outlays, $
47
42
,
297
596
,000,000.
Fiscal year 2031:
(A) New budget authority, $
45
35
,
460
188
,000,000. (B) Outlays, $
46
40
,
521
366
,000,000.
Fiscal year 2032:
(A) New budget authority, $
50
39
,
176
697
,000,000. (B) Outlays, $
48
41
,
864
611
,000,000.
Fiscal year 2033:
(A) New budget authority, $
35
24
,
184
489
,000,000. (B) Outlays, $
34
25
,
040
941
,000,000.
Fiscal year 2034:
(A) New budget authority, $
27
16
,
122
203
,000,000. (B) Outlays, $
26
17
,
021
040
,000,000.
… 2 unchanged passages …
(A) New budget authority, $88,
219
319
,000,000. (B) Outlays, $
90
89
,
074
764
,000,000.
Fiscal year 2026:
(A) New budget authority, $
89
67
,
760
633
,000,000. (B) Outlays, $
90
80
,
428
552
,000,000.
Fiscal year 2027:
(A) New budget authority, $
83
45
,
830
140
,000,000. (B) Outlays, $
91
75
,
282
844
,000,000.
Fiscal year 2028:
(A) New budget authority, $
85
45
,
498
985
,000,000. (B) Outlays, $
91
71
,
754
673
,000,000.
Fiscal year 2029:
(A) New budget authority, $
87
46
,
319
956
,000,000. (B) Outlays, $
92
67
,
172
691
,000,000.
Fiscal year 2030:
(A) New budget authority, $
88
47
,
970
707
,000,000. (B) Outlays, $
92
63
,
442
948
,000,000.
Fiscal year 2031:
(A) New budget authority, $
91
48
,
016
854
,000,000. (B) Outlays, $
92
60
,
640
580
,000,000.
Fiscal year 2032:
(A) New budget authority, $
92
49
,
975
918
,000,000. (B) Outlays, $
91
56
,
686
444
,000,000.
Fiscal year 2033:
(A) New budget authority, $
95
51
,
254
246
,000,000. (B) Outlays, $
93
55
,
640
797
,000,000.
Fiscal year 2034:
(A) New budget authority, $
97
52
,
211
225
,000,000. (B) Outlays, $
94
55
,
831
480
,000,000.
… 5 unchanged passages …
(A) New budget authority, $
59
28
,
875
163
,000,000. (B) Outlays, $
58
46
,
018
212
,000,000.
Fiscal year 2027:
(A) New budget authority, $
64
31
,
092
716
,000,000. (B) Outlays, $
61
33
,
792
686
,000,000.
Fiscal year 2028:
(A) New budget authority, $
66
33
,
014
008
,000,000. (B) Outlays, $
64
34
,
140
426
,000,000.
Fiscal year 2029:
(A) New budget authority, $
66
33
,
999
334
,000,000. (B) Outlays, $
63
32
,
775
441
,000,000.
Fiscal year 2030:
(A) New budget authority, $
65
30
,
213
857
,000,000. (B) Outlays, $
62
30
,
065
098
,000,000.
Fiscal year 2031:
(A) New budget authority, $
65
30
,
516
468
,000,000. (B) Outlays, $
62
29
,
226
609
,000,000.
Fiscal year 2032:
(A) New budget authority, $
66
31
,
979
239
,000,000. (B) Outlays, $
63
30
,
432
163
,000,000.
Fiscal year 2033:
(A) New budget authority, $
68
32
,
738
276
,000,000. (B) Outlays, $
64
30
,
825
893
,000,000.
Fiscal year 2034:
(A) New budget authority, $
70
32
,
130
912
,000,000. (B) Outlays, $
66
31
,
347
721
,000,000.
… 3 unchanged passages …
(B) Outlays,
-$
−$
18,175,000,000.
Fiscal year 2026:
(A) New budget authority, $
33
32
,
817
747
,000,000. (B) Outlays,
-$207
−$626
,000,000.
Fiscal year 2027:
(A) New budget authority, $
29
28
,
807
145
,000,000. (B) Outlays, $
8
7
,
387
710
,000,000.
Fiscal year 2028:
(A) New budget authority,
-$55
−$56
,
092
796
,000,000. (B) Outlays,
-$64
−$65
,
213
194
,000,000.
Fiscal year 2029:
(A) New budget authority, $
27
25
,
308
562
,000,000. (B) Outlays, $
17
15
,
149
976
,000,000.
Fiscal year 2030:
(A) New budget authority, $
27
25
,
501
712
,000,000. (B) Outlays, $
14
12
,
043
680
,000,000.
Fiscal year 2031:
(A) New budget authority, $
27
25
,
776
941
,000,000. (B) Outlays, $
9
7
,
486
932
,000,000.
Fiscal year 2032:
(A) New budget authority, $
28
26
,
233
354
,000,000. (B) Outlays, $
6
5
,
788
060
,000,000.
Fiscal year 2033:
(A) New budget authority, $
22
20
,
118
192
,000,000. (B) Outlays,
-$2
−$4
,
412
224
,000,000.
Fiscal year 2034:
(A) New budget authority, $
31
29
,
836
862
,000,000. (B) Outlays, $
4
2
,
308
451
,000,000.
… 5 unchanged passages …
(A) New budget authority, $
176
167
,
249
673
,000,000. (B) Outlays, $
154
152
,
625
541
,000,000.
Fiscal year 2027:
(A) New budget authority, $
178
132
,
411
085
,000,000. (B) Outlays, $
162
158
,
925
068
,000,000.
Fiscal year 2028:
(A) New budget authority, $
180
133
,
607
386
,000,000. (B) Outlays, $
171
162
,
610
528
,000,000.
Fiscal year 2029:
(A) New budget authority, $
182
134
,
610
447
,000,000. (B) Outlays, $
175
160
,
967
846
,000,000.
Fiscal year 2030:
(A) New budget authority, $
179
129
,
144
994
,000,000. (B) Outlays, $
174
150
,
442
790
,000,000.
Fiscal year 2031:
(A) New budget authority, $
181
130
,
099
964
,000,000. (B) Outlays, $
178
147
,
314
539
,000,000.
Fiscal year 2032:
(A) New budget authority, $
189
138
,
966
846
,000,000. (B) Outlays, $
187
150
,
367
163
,000,000.
Fiscal year 2033:
(A) New budget authority, $
192
140
,
692
544
,000,000. (B) Outlays, $
191
149
,
213
247
,000,000.
Fiscal year 2034:
(A) New budget authority, $
195
142
,
495
271
,000,000. (B) Outlays, $
194
149
,
754
454
,000,000.
… 2 unchanged passages …
(A) New budget authority, $
87
90
,
762
242
,000,000. (B) Outlays, $78,
752
592
,000,000.
Fiscal year 2026:
(A) New budget authority, $
89
20
,
366
135
,000,000. (B) Outlays, $
69
64
,
845
267
,000,000.
Fiscal year 2027:
(A) New budget authority, $
91
19
,
267
259
,000,000. (B) Outlays, $
74
56
,
426
506
,000,000.
Fiscal year 2028:
(A) New budget authority, $
92
19
,
897
462
,000,000. (B) Outlays, $
75
45
,
604
101
,000,000.
Fiscal year 2029:
(A) New budget authority, $
94
19
,
812
888
,000,000. (B) Outlays, $
77
35
,
850
976
,000,000.
Fiscal year 2030:
(A) New budget authority, $
96
20
,
811
326
,000,000. (B) Outlays, $
82
31
,
903
026
,000,000.
Fiscal year 2031:
(A) New budget authority, $
98
20
,
774
727
,000,000. (B) Outlays, $
86
27
,
364
543
,000,000.
Fiscal year 2032:
(A) New budget authority, $
100
21
,
621
007
,000,000. (B) Outlays, $
88
24
,
685
658
,000,000.
Fiscal year 2033:
(A) New budget authority, $
102
21
,
711
462
,000,000. (B) Outlays, $
90
22
,
723
754
,000,000.
Fiscal year 2034:
(A) New budget authority, $
104
21
,
818
864
,000,000. (B) Outlays, $
93
21
,
005
733
,000,000.
… 2 unchanged passages …
(A) New budget authority, $149,
303
379
,000,000. (B) Outlays, $171,
916
920
,000,000.
… 2 unchanged passages …
(B) Outlays, $151,
605
639
,000,000.
Fiscal year 2027:
(A) New budget authority, $155,
153
152
,000,000. (B) Outlays, $
150
151
,
979
206
,000,000.
Fiscal year 2028:
(A) New budget authority, $157,
971
970
,000,000. (B) Outlays, $152,
819
914
,000,000.
Fiscal year 2029:
(A) New budget authority, $160,
952
942
,000,000. (B) Outlays, $155,
502
518
,000,000.
Fiscal year 2030:
(A) New budget authority, $163,
865
842
,000,000. (B) Outlays, $158,
383
366
,000,000.
Fiscal year 2031:
(A) New budget authority, $166,
854
812
,000,000. (B) Outlays, $161,
312
277
,000,000.
Fiscal year 2032:
(A) New budget authority, $170,
223
169
,000,000. (B) Outlays, $164,
486
438
,000,000.
Fiscal year 2033:
(A) New budget authority, $173,
784
711
,000,000. (B) Outlays, $167,
792
726
,000,000.
Fiscal year 2034:
(A) New budget authority, $176,
834
750
,000,000. (B) Outlays, $170,
876
798
,000,000.
… 2 unchanged passages …
(A) New budget authority, $
945
948
,
070
957
,000,000. (B) Outlays, $
961
963
,
180
482
,000,000.
Fiscal year 2026:
(A) New budget authority, $992,
460
092
,000,000. (B) Outlays, $
976
977
,
705
707
,000,000.
Fiscal year 2027:
(A) New budget authority, $1,
021
020
,
428
326
,000,000. (B) Outlays, $1,021,
884
663
,000,000.
Fiscal year 2028:
(A) New budget authority, $1,
056
054
,
522
949
,000,000. (B) Outlays, $1,
053
051
,
318
917
,000,000.
Fiscal year 2029:
(A) New budget authority, $1,
099
098
,
999
389
,000,000. (B) Outlays, $1,
095
093
,
100
560
,000,000.
Fiscal year 2030:
(A) New budget authority, $1,
144
142
,
066
669
,000,000. (B) Outlays, $1,
133
132
,
456
096
,000,000.
Fiscal year 2031:
(A) New budget authority, $1,
177
176
,
723
497
,000,000. (B) Outlays, $1,
176
175
,
648
451
,000,000.
Fiscal year 2032:
(A) New budget authority, $1,
228
226
,
051
824
,000,000. (B) Outlays, $1,
218
216
,
203
998
,000,000.
Fiscal year 2033:
(A) New budget authority, $1,
278
276
,
134
881
,000,000. (B) Outlays, $1,
267
266
,
299
068
,000,000.
Fiscal year 2034:
(A) New budget authority, $1,
311
310
,
280
000
,000,000. (B) Outlays, $1,
300
298
,
233
975
,000,000.
… 2 unchanged passages …
(A) New budget authority, $
950
952
,
891
239
,000,000. (B) Outlays, $
950
951
,
641
989
,000,000.
Fiscal year 2026:
(A) New budget authority, $1,007,
431
093
,000,000. (B) Outlays, $1,
009
008
,
161
459
,000,000.
Fiscal year 2027:
(A) New budget authority, $1,
067
066
,
229
571
,000,000. (B) Outlays, $1,066,
832
331
,000,000.
Fiscal year 2028:
(A) New budget authority, $1,
210
209
,
420
735
,000,000. (B) Outlays, $1,208,
952
675
,000,000.
Fiscal year 2029:
(A) New budget authority, $1,
126
125
,
357
645
,000,000. (B) Outlays, $1,125,
928
301
,000,000.
Fiscal year 2030:
(A) New budget authority, $1,
276
275
,
602
864
,000,000. (B) Outlays, $1,
276
275
,
291
627
,000,000.
Fiscal year 2031:
(A) New budget authority, $1,
358
357
,
554
791
,000,000. (B) Outlays, $1,
358
357
,
476
726
,000,000.
Fiscal year 2032:
(A) New budget authority, $1,445,
982
195
,000,000. (B) Outlays, $1,445,
966
191
,000,000.
Fiscal year 2033:
(A) New budget authority, $1,
664
659
,
590
329
,000,000. (B) Outlays, $1,
664
659
,
595
346
,000,000.
Fiscal year 2034:
(A) New budget authority, $1,
667
666
,
328
492
,000,000. (B) Outlays, $1,
667
666
,
321
497
,000,000.
… 2 unchanged passages …
(A) New budget authority, $712,
446
538
,000,000. (B) Outlays, $709,
132
200
,000,000.
Fiscal year 2026:
(A) New budget authority, $
702
691
,
007
755
,000,000. (B) Outlays, $
699
690
,
086
914
,000,000.
Fiscal year 2027:
(A) New budget authority, $
703
708
,
592
645
,000,000. (B) Outlays, $
698
703
,
238
648
,000,000.
Fiscal year 2028:
(A) New budget authority, $
722
727
,
280
434
,000,000. (B) Outlays, $
721
727
,
948
234
,000,000.
Fiscal year 2029:
(A) New budget authority, $
724
728
,
420
925
,000,000. (B) Outlays, $
710
714
,
279
850
,000,000.
Fiscal year 2030:
(A) New budget authority, $
743
748
,
824
162
,000,000. (B) Outlays, $
735
739
,
068
465
,000,000.
Fiscal year 2031:
(A) New budget authority, $
757
760
,
021
737
,000,000. (B) Outlays, $
747
751
,
723
498
,000,000.
Fiscal year 2032:
(A) New budget authority, $
775
778
,
456
878
,000,000. (B) Outlays, $
765
768
,
416
898
,000,000.
Fiscal year 2033:
(A) New budget authority, $
796
800
,
775
142
,000,000. (B) Outlays, $
793
796
,
408
835
,000,000.
Fiscal year 2034:
(A) New budget authority, $
805
808
,
597
455
,000,000. (B) Outlays, $
795
798
,
238
159
,000,000.
… 36 unchanged passages …
(A) New budget authority, $382,
625
555
,000,000. (B) Outlays, $378,
862
814
,000,000.
Fiscal year 2027:
(A) New budget authority, $404,
665
594
,000,000. (B) Outlays, $401,
379
319
,000,000.
Fiscal year 2028:
(A) New budget authority, $427,
402
329
,000,000. (B) Outlays, $444,
309
241
,000,000.
Fiscal year 2029:
(A) New budget authority, $447,
832
757
,000,000. (B) Outlays, $422,
387
317
,000,000.
Fiscal year 2030:
(A) New budget authority, $466,
693
616
,000,000. (B) Outlays, $461,
795
720
,000,000.
Fiscal year 2031:
(A) New budget authority, $486,
796
716
,000,000. (B) Outlays, $481,
715
638
,000,000.
Fiscal year 2032:
(A) New budget authority, $507,
269
187
,000,000. (B) Outlays, $502,
734
655
,000,000.
Fiscal year 2033:
(A) New budget authority, $528,
816
733
,000,000. (B) Outlays, $548,
814
734
,000,000.
Fiscal year 2034:
(A) New budget authority, $550,
747
662
,000,000. (B) Outlays, $547,
878
796
,000,000.
… 5 unchanged passages …
(A) New budget authority, $
90
88
,
002
992
,000,000. (B) Outlays, $87,
682
024
,000,000.
Fiscal year 2027:
(A) New budget authority, $
89
87
,
047
701
,000,000. (B) Outlays, $
87
86
,
256
420
,000,000.
Fiscal year 2028:
(A) New budget authority, $
91
89
,
066
687
,000,000. (B) Outlays, $
89
88
,
499
514
,000,000.
Fiscal year 2029:
(A) New budget authority, $
93
92
,
553
142
,000,000. (B) Outlays, $
91
90
,
849
690
,000,000.
Fiscal year 2030:
(A) New budget authority, $
96
94
,
019
574
,000,000. (B) Outlays, $
94
92
,
292
986
,000,000.
Fiscal year 2031:
(A) New budget authority, $
98
96
,
328
848
,000,000. (B) Outlays, $
96
94
,
277
869
,000,000.
Fiscal year 2032:
(A) New budget authority, $
105
104
,
979
463
,000,000. (B) Outlays, $
103
101
,
293
844
,000,000.
Fiscal year 2033:
(A) New budget authority, $
108
107
,
710
160
,000,000. (B) Outlays, $
105
104
,
827
339
,000,000.
Fiscal year 2034:
(A) New budget authority, $
111
109
,
020
431
,000,000. (B) Outlays, $
108
106
,
460
934
,000,000.
… 5 unchanged passages …
(A) New budget authority, $30,
678
666
,000,000. (B) Outlays, $38,
289
285
,000,000.
Fiscal year 2027:
(A) New budget authority, $32,
078
065
,000,000. (B) Outlays, $38,
267
261
,000,000.
Fiscal year 2028:
(A) New budget authority, $
33
32
,
007
994
,000,000. (B) Outlays, $37,
965
957
,000,000.
Fiscal year 2029:
(A) New budget authority, $33,
784
770
,000,000. (B) Outlays, $37,
804
793
,000,000.
Fiscal year 2030:
(A) New budget authority, $34,
628
614
,000,000. (B) Outlays, $37,
998
985
,000,000.
Fiscal year 2031:
(A) New budget authority, $35,
261
247
,000,000. (B) Outlays, $37,
038
024
,000,000.
Fiscal year 2032:
(A) New budget authority, $36,
204
189
,000,000. (B) Outlays, $36,
321
307
,000,000.
Fiscal year 2033:
(A) New budget authority, $36,
975
960
,000,000. (B) Outlays, $36,
772
758
,000,000.
Fiscal year 2034:
(A) New budget authority, $37,
697
681
,000,000. (B) Outlays, $37,
281
266
,000,000.
… 2 unchanged passages …
(A) New budget authority, $1,
027
011
,
694
643
,000,000. (B) Outlays, $1,
027
011
,
694
643
,000,000.
Fiscal year 2026:
(A) New budget authority, $1,
090
031
,
880
561
,000,000. (B) Outlays, $1,
090
031
,
880
561
,000,000.
Fiscal year 2027:
(A) New budget authority, $1,
160
078
,
719
839
,000,000. (B) Outlays, $1,
160
078
,
719
839
,000,000.
Fiscal year 2028:
(A) New budget authority, $1,
250
150
,
257
343
,000,000. (B) Outlays, $1,
250
150
,
257
343
,000,000.
Fiscal year 2029:
(A) New budget authority, $1,
328
213
,
362
150
,000,000. (B) Outlays, $1,
328
213
,
362
150
,000,000.
Fiscal year 2030:
(A) New budget authority, $1,
399
269
,
636
439
,000,000. (B) Outlays, $1,
399
269
,
636
439
,000,000.
Fiscal year 2031:
(A) New budget authority, $1,
475
332
,
634
808
,000,000. (B) Outlays, $1,
475
332
,
634
808
,000,000.
Fiscal year 2032:
(A) New budget authority, $1,
551
398
,
786
649
,000,000. (B) Outlays, $1,
551
398
,
786
649
,000,000.
Fiscal year 2033:
(A) New budget authority, $1,
619
457
,
496
676
,000,000. (B) Outlays, $1,
619
457
,
496
676
,000,000.
Fiscal year 2034:
(A) New budget authority, $1,
693
525
,
863
604
,000,000. (B) Outlays, $1,
693
525
,
863
604
,000,000.
… 2 unchanged passages …
(A) New budget authority,
$0
−$1,009,217,000,000
. (B) Outlays,
$0
−$987,791,000,000
.
Fiscal year 2026:
(A) New budget authority,
$0
−$888,800,000,000
. (B) Outlays,
$0
−$900,514,000,000
.
Fiscal year 2027:
(A) New budget authority,
$0
−$890,385,000,000
. (B) Outlays,
$0
−$894,905,000,000
.
Fiscal year 2028:
(A) New budget authority,
$0
−$848,052,000,000
. (B) Outlays,
$0
−$850,422,000,000
.
Fiscal year 2029:
(A) New budget authority,
$0
−$851,534,000,000
. (B) Outlays,
$0
−$852,928,000,000
.
Fiscal year 2030:
(A) New budget authority,
$0
−$874,353,000,000
. (B) Outlays,
$0
−$874,414,000,000
.
Fiscal year 2031:
(A) New budget authority,
$0
−$874,523,000,000
. (B) Outlays,
$0
−$874,523,000,000
.
Fiscal year 2032:
(A) New budget authority,
$0
−$894,135,000,000
. (B) Outlays,
$0
−$894,135,000,000
.
Fiscal year 2033:
(A) New budget authority,
$0
−$940,797,000,000
. (B) Outlays,
$0
−$940,797,000,000
.
Fiscal year 2034:
(A) New budget authority,
$0
−$913,790,000,000
. (B) Outlays,
$0
−$913,790,000,000
. (20)
Government-Wide
Undistributed
Savings
Offsetting Receipts
(
930
950
):
Fiscal year 2025:
(A) New budget authority,
-$120
−$127
,
000
603
,000,000. (B) Outlays,
-$120
−$127
,
000
603
,000,000.
Fiscal year 2026:
(A) New budget authority,
-$299
−$135
,
849
110
,000,000. (B) Outlays,
-$179
−$135
,
763
110
,000,000.
Fiscal year 2027:
(A) New budget authority,
-$375
−$137
,
694
883
,000,000. (B) Outlays,
-$231
−$137
,
910
883
,000,000.
Fiscal year 2028:
(A) New budget authority,
-$384
−$141
,
958
145
,000,000. (B) Outlays,
-$263
−$141
,
939
165
,000,000.
Fiscal year 2029:
(A) New budget authority,
-$393
−$145
,
736
400
,000,000. (B) Outlays,
-$296
−$145
,
185
407
,000,000.
Fiscal year 2030:
(A) New budget authority,
-$407
−$149
,
056
582
,000,000. (B) Outlays,
-$330
−$149
,
476
581
,000,000.
Fiscal year 2031:
(A) New budget authority,
-$419
−$154
,
698
014
,000,000. (B) Outlays,
-$357
−$154
,
567
013
,000,000.
Fiscal year 2032:
(A) New budget authority,
-$431
−$160
,
652
114
,000,000. (B) Outlays,
-$381
−$160
,
290
113
,000,000.
Fiscal year 2033:
(A) New budget authority,
-$445
−$166
,
094
102
,000,000. (B) Outlays,
-$402
−$166
,
008
101
,000,000.
Fiscal year 2034:
(A) New budget authority,
-$460
−$171
,
001
015
,000,000. (B) Outlays,
-$420,590,000,000. (21) Undistributed Offsetting Receipts (950): Fiscal year 2025: (A) New budget authority, -$127,603,000,000. (B) Outlays, -$127,603,000,000. Fiscal year 2026: (A) New budget authority, -$135,110,000,000. (B) Outlays, -$135,110,000,000. Fiscal year 2027: (A) New budget authority, -$137,883,000,000. (B) Outlays, -$137,883,000,000. Fiscal year 2028: (A) New budget authority, -$141,145,000,000. (B) Outlays, -$141,165,000,000. Fiscal year 2029: (A) New budget authority, -$145,400,000,000. (B) Outlays, -$145,407,000,000. Fiscal year 2030: (A) New budget authority, -$149,582,000,000. (B) Outlays, -$149,581,000,000. Fiscal year 2031: (A) New budget authority, -$154,014,000,000. (B) Outlays, -$154,013,000,000. Fiscal year 2032: (A) New budget authority, -$160,114,000,000. (B) Outlays, -$160,113,000,000. Fiscal year 2033: (A) New budget authority, -$166,102,000,000. (B) Outlays, -$166,101,000,000. Fiscal year 2034: (A) New budget authority, -$
−$
171,
015,000,000. (B) Outlays,-$171,
014,000,000.
(22) Across-the-Board Adjustment (990): Fiscal year 2025: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2026: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2027: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2028: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2029: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2030: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2031: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2032: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2033: (A) New budget authority, -$5,000,000. (B) Outlays, $0. Fiscal year 2034: (A) New budget authority, -$5,000,000. (B) Outlays, $0.
Congress determines and declares that the appropriate levels of new budget authority and outlays for fiscal years 2025 through 2034 for each major functional category are:
(1) National Defense (050):
Fiscal year 2025:
(A) New budget authority, $933,484,000,000.
(B) Outlays, $909,629,000,000.
Fiscal year 2026:
(A) New budget authority, $901,220,000,000.
(B) Outlays, $904,412,000,000.
Fiscal year 2027:
(A) New budget authority, $923,020,000,000.
(B) Outlays, $911,956,000,000.
Fiscal year 2028:
(A) New budget authority, $944,111,000,000.
(B) Outlays, $934,660,000,000.
Fiscal year 2029:
(A) New budget authority, $966,203,000,000.
(B) Outlays, $942,419,000,000.
Fiscal year 2030:
(A) New budget authority, $989,212,000,000.
(B) Outlays, $966,361,000,000.
Fiscal year 2031:
(A) New budget authority, $1,012,715,000,000.
(B) Outlays, $984,795,000,000.
Fiscal year 2032:
(A) New budget authority, $1,036,723,000,000.
(B) Outlays, $1,003,888,000,000.
Fiscal year 2033:
(A) New budget authority, $1,062,319,000,000.
(B) Outlays, $1,037,888,000,000.
Fiscal year 2034:
(A) New budget authority, $1,087,382,000,000.
(B) Outlays, $1,054,430,000,000.
(2) International Affairs (150):
Fiscal year 2025:
(A) New budget authority, $65,962,000,000.
(B) Outlays, $69,206,000,000.
Fiscal year 2026:
(A) New budget authority, $61,716,000,000.
(B) Outlays, $67,669,000,000.
Fiscal year 2027:
(A) New budget authority, $62,249,000,000.
(B) Outlays, $66,456,000,000.
Fiscal year 2028:
(A) New budget authority, $63,512,000,000.
(B) Outlays, $62,391,000,000.
Fiscal year 2029:
(A) New budget authority, $64,944,000,000.
(B) Outlays, $62,832,000,000.
Fiscal year 2030:
(A) New budget authority, $66,408,000,000.
(B) Outlays, $63,077,000,000.
Fiscal year 2031:
(A) New budget authority, $67,878,000,000.
(B) Outlays, $64,002,000,000.
Fiscal year 2032:
(A) New budget authority, $69,343,000,000.
(B) Outlays, $65,176,000,000.
Fiscal year 2033:
(A) New budget authority, $70,874,000,000.
(B) Outlays, $66,517,000,000.
Fiscal year 2034:
(A) New budget authority, $72,435,000,000.
(B) Outlays, $67,889,000,000.
(3) General Science, Space, and Technology (250):
Fiscal year 2025:
(A) New budget authority, $42,084,000,000.
(B) Outlays, $41,734,000,000.
Fiscal year 2026:
(A) New budget authority, $41,345,000,000.
(B) Outlays, $41,844,000,000.
Fiscal year 2027:
(A) New budget authority, $42,264,000,000.
(B) Outlays, $41,923,000,000.
Fiscal year 2028:
(A) New budget authority, $43,099,000,000.
(B) Outlays, $42,198,000,000.
Fiscal year 2029:
(A) New budget authority, $44,017,000,000.
(B) Outlays, $42,887,000,000.
Fiscal year 2030:
(A) New budget authority, $44,980,000,000.
(B) Outlays, $43,633,000,000.
Fiscal year 2031:
(A) New budget authority, $45,946,000,000.
(B) Outlays, $44,551,000,000.
Fiscal year 2032:
(A) New budget authority, $46,922,000,000.
(B) Outlays, $45,486,000,000.
Fiscal year 2033:
(A) New budget authority, $47,936,000,000.
(B) Outlays, $46,460,000,000.
Fiscal year 2034:
(A) New budget authority, $48,985,000,000.
(B) Outlays, $47,466,000,000.
(4) Energy (270):
Fiscal year 2025:
(A) New budget authority, $39,842,000,000.
(B) Outlays, $37,587,000,000.
Fiscal year 2026:
(A) New budget authority, $39,958,000,000.
(B) Outlays, $44,514,000,000.
Fiscal year 2027:
(A) New budget authority, $34,098,000,000.
(B) Outlays, $52,768,000,000.
Fiscal year 2028:
(A) New budget authority, $34,825,000,000.
(B) Outlays, $51,623,000,000.
Fiscal year 2029:
(A) New budget authority, $35,770,000,000.
(B) Outlays, $48,582,000,000.
Fiscal year 2030:
(A) New budget authority, $33,946,000,000.
(B) Outlays, $42,596,000,000.
Fiscal year 2031:
(A) New budget authority, $35,188,000,000.
(B) Outlays, $40,366,000,000.
Fiscal year 2032:
(A) New budget authority, $39,697,000,000.
(B) Outlays, $41,611,000,000.
Fiscal year 2033:
(A) New budget authority, $24,489,000,000.
(B) Outlays, $25,941,000,000.
Fiscal year 2034:
(A) New budget authority, $16,203,000,000.
(B) Outlays, $17,040,000,000.
(5) Natural Resources and Environment (300):
Fiscal year 2025:
(A) New budget authority, $88,319,000,000.
(B) Outlays, $89,764,000,000.
Fiscal year 2026:
(A) New budget authority, $67,633,000,000.
(B) Outlays, $80,552,000,000.
Fiscal year 2027:
(A) New budget authority, $45,140,000,000.
(B) Outlays, $75,844,000,000.
Fiscal year 2028:
(A) New budget authority, $45,985,000,000.
(B) Outlays, $71,673,000,000.
Fiscal year 2029:
(A) New budget authority, $46,956,000,000.
(B) Outlays, $67,691,000,000.
Fiscal year 2030:
(A) New budget authority, $47,707,000,000.
(B) Outlays, $63,948,000,000.
Fiscal year 2031:
(A) New budget authority, $48,854,000,000.
(B) Outlays, $60,580,000,000.
Fiscal year 2032:
(A) New budget authority, $49,918,000,000.
(B) Outlays, $56,444,000,000.
Fiscal year 2033:
(A) New budget authority, $51,246,000,000.
(B) Outlays, $55,797,000,000.
Fiscal year 2034:
(A) New budget authority, $52,225,000,000.
(B) Outlays, $55,480,000,000.
(6) Agriculture (350):
Fiscal year 2025:
(A) New budget authority, $58,457,000,000.
(B) Outlays, $41,846,000,000.
Fiscal year 2026:
(A) New budget authority, $28,163,000,000.
(B) Outlays, $46,212,000,000.
Fiscal year 2027:
(A) New budget authority, $31,716,000,000.
(B) Outlays, $33,686,000,000.
Fiscal year 2028:
(A) New budget authority, $33,008,000,000.
(B) Outlays, $34,426,000,000.
Fiscal year 2029:
(A) New budget authority, $33,334,000,000.
(B) Outlays, $32,441,000,000.
Fiscal year 2030:
(A) New budget authority, $30,857,000,000.
(B) Outlays, $30,098,000,000.
Fiscal year 2031:
(A) New budget authority, $30,468,000,000.
(B) Outlays, $29,609,000,000.
Fiscal year 2032:
(A) New budget authority, $31,239,000,000.
(B) Outlays, $30,163,000,000.
Fiscal year 2033:
(A) New budget authority, $32,276,000,000.
(B) Outlays, $30,893,000,000.
Fiscal year 2034:
(A) New budget authority, $32,912,000,000.
(B) Outlays, $31,721,000,000.
(7) Commerce and Housing Credit (370):
Fiscal year 2025:
(A) New budget authority, $12,477,000,000.
(B) Outlays, −$18,175,000,000.
Fiscal year 2026:
(A) New budget authority, $32,747,000,000.
(B) Outlays, −$626,000,000.
Fiscal year 2027:
(A) New budget authority, $28,145,000,000.
(B) Outlays, $7,710,000,000.
Fiscal year 2028:
(A) New budget authority, −$56,796,000,000.
(B) Outlays, −$65,194,000,000.
Fiscal year 2029:
(A) New budget authority, $25,562,000,000.
(B) Outlays, $15,976,000,000.
Fiscal year 2030:
(A) New budget authority, $25,712,000,000.
(B) Outlays, $12,680,000,000.
Fiscal year 2031:
(A) New budget authority, $25,941,000,000.
(B) Outlays, $7,932,000,000.
Fiscal year 2032:
(A) New budget authority, $26,354,000,000.
(B) Outlays, $5,060,000,000.
Fiscal year 2033:
(A) New budget authority, $20,192,000,000.
(B) Outlays, −$4,224,000,000.
Fiscal year 2034:
(A) New budget authority, $29,862,000,000.
(B) Outlays, $2,451,000,000.
(8) Transportation (400):
Fiscal year 2025:
(A) New budget authority, $173,158,000,000.
(B) Outlays, $144,771,000,000.
Fiscal year 2026:
(A) New budget authority, $167,673,000,000.
(B) Outlays, $152,541,000,000.
Fiscal year 2027:
(A) New budget authority, $132,085,000,000.
(B) Outlays, $158,068,000,000.
Fiscal year 2028:
(A) New budget authority, $133,386,000,000.
(B) Outlays, $162,528,000,000.
Fiscal year 2029:
(A) New budget authority, $134,447,000,000.
(B) Outlays, $160,846,000,000.
Fiscal year 2030:
(A) New budget authority, $129,994,000,000.
(B) Outlays, $150,790,000,000.
Fiscal year 2031:
(A) New budget authority, $130,964,000,000.
(B) Outlays, $147,539,000,000.
Fiscal year 2032:
(A) New budget authority, $138,846,000,000.
(B) Outlays, $150,163,000,000.
Fiscal year 2033:
(A) New budget authority, $140,544,000,000.
(B) Outlays, $149,247,000,000.
Fiscal year 2034:
(A) New budget authority, $142,271,000,000.
(B) Outlays, $149,454,000,000.
(9) Community and Regional Development (450):
Fiscal year 2025:
(A) New budget authority, $90,242,000,000.
(B) Outlays, $78,592,000,000.
Fiscal year 2026:
(A) New budget authority, $20,135,000,000.
(B) Outlays, $64,267,000,000.
Fiscal year 2027:
(A) New budget authority, $19,259,000,000.
(B) Outlays, $56,506,000,000.
Fiscal year 2028:
(A) New budget authority, $19,462,000,000.
(B) Outlays, $45,101,000,000.
Fiscal year 2029:
(A) New budget authority, $19,888,000,000.
(B) Outlays, $35,976,000,000.
Fiscal year 2030:
(A) New budget authority, $20,326,000,000.
(B) Outlays, $31,026,000,000.
Fiscal year 2031:
(A) New budget authority, $20,727,000,000.
(B) Outlays, $27,543,000,000.
Fiscal year 2032:
(A) New budget authority, $21,007,000,000.
(B) Outlays, $24,658,000,000.
Fiscal year 2033:
(A) New budget authority, $21,462,000,000.
(B) Outlays, $22,754,000,000.
Fiscal year 2034:
(A) New budget authority, $21,864,000,000.
(B) Outlays, $21,733,000,000.
(10) Education, Training, Employment, and Social Services (500):
Fiscal year 2025:
(A) New budget authority, $149,379,000,000.
(B) Outlays, $171,920,000,000.
Fiscal year 2026:
(A) New budget authority, $152,714,000,000.
(B) Outlays, $151,639,000,000.
Fiscal year 2027:
(A) New budget authority, $155,152,000,000.
(B) Outlays, $151,206,000,000.
Fiscal year 2028:
(A) New budget authority, $157,970,000,000.
(B) Outlays, $152,914,000,000.
Fiscal year 2029:
(A) New budget authority, $160,942,000,000.
(B) Outlays, $155,518,000,000.
Fiscal year 2030:
(A) New budget authority, $163,842,000,000.
(B) Outlays, $158,366,000,000.
Fiscal year 2031:
(A) New budget authority, $166,812,000,000.
(B) Outlays, $161,277,000,000.
Fiscal year 2032:
(A) New budget authority, $170,169,000,000.
(B) Outlays, $164,438,000,000.
Fiscal year 2033:
(A) New budget authority, $173,711,000,000.
(B) Outlays, $167,726,000,000.
Fiscal year 2034:
(A) New budget authority, $176,750,000,000.
(B) Outlays, $170,798,000,000.
(11) Health (550):
Fiscal year 2025:
(A) New budget authority, $948,957,000,000.
(B) Outlays, $963,482,000,000.
Fiscal year 2026:
(A) New budget authority, $992,092,000,000.
(B) Outlays, $977,707,000,000.
Fiscal year 2027:
(A) New budget authority, $1,020,326,000,000.
(B) Outlays, $1,021,663,000,000.
Fiscal year 2028:
(A) New budget authority, $1,054,949,000,000.
(B) Outlays, $1,051,917,000,000.
Fiscal year 2029:
(A) New budget authority, $1,098,389,000,000.
(B) Outlays, $1,093,560,000,000.
Fiscal year 2030:
(A) New budget authority, $1,142,669,000,000.
(B) Outlays, $1,132,096,000,000.
Fiscal year 2031:
(A) New budget authority, $1,176,497,000,000.
(B) Outlays, $1,175,451,000,000.
Fiscal year 2032:
(A) New budget authority, $1,226,824,000,000.
(B) Outlays, $1,216,998,000,000.
Fiscal year 2033:
(A) New budget authority, $1,276,881,000,000.
(B) Outlays, $1,266,068,000,000.
Fiscal year 2034:
(A) New budget authority, $1,310,000,000,000.
(B) Outlays, $1,298,975,000,000.
(12) Medicare (570):
Fiscal year 2025:
(A) New budget authority, $952,239,000,000.
(B) Outlays, $951,989,000,000.
Fiscal year 2026:
(A) New budget authority, $1,007,093,000,000.
(B) Outlays, $1,008,459,000,000.
Fiscal year 2027:
(A) New budget authority, $1,066,571,000,000.
(B) Outlays, $1,066,331,000,000.
Fiscal year 2028:
(A) New budget authority, $1,209,735,000,000.
(B) Outlays, $1,208,675,000,000.
Fiscal year 2029:
(A) New budget authority, $1,125,645,000,000.
(B) Outlays, $1,125,301,000,000.
Fiscal year 2030:
(A) New budget authority, $1,275,864,000,000.
(B) Outlays, $1,275,627,000,000.
Fiscal year 2031:
(A) New budget authority, $1,357,791,000,000.
(B) Outlays, $1,357,726,000,000.
Fiscal year 2032:
(A) New budget authority, $1,445,195,000,000.
(B) Outlays, $1,445,191,000,000.
Fiscal year 2033:
(A) New budget authority, $1,659,329,000,000.
(B) Outlays, $1,659,346,000,000.
Fiscal year 2034:
(A) New budget authority, $1,666,492,000,000.
(B) Outlays, $1,666,497,000,000.
(13) Income Security (600):
Fiscal year 2025:
(A) New budget authority, $712,538,000,000.
(B) Outlays, $709,200,000,000.
Fiscal year 2026:
(A) New budget authority, $691,755,000,000.
(B) Outlays, $690,914,000,000.
Fiscal year 2027:
(A) New budget authority, $708,645,000,000.
(B) Outlays, $703,648,000,000.
Fiscal year 2028:
(A) New budget authority, $727,434,000,000.
(B) Outlays, $727,234,000,000.
Fiscal year 2029:
(A) New budget authority, $728,925,000,000.
(B) Outlays, $714,850,000,000.
Fiscal year 2030:
(A) New budget authority, $748,162,000,000.
(B) Outlays, $739,465,000,000.
Fiscal year 2031:
(A) New budget authority, $760,737,000,000.
(B) Outlays, $751,498,000,000.
Fiscal year 2032:
(A) New budget authority, $778,878,000,000.
(B) Outlays, $768,898,000,000.
Fiscal year 2033:
(A) New budget authority, $800,142,000,000.
(B) Outlays, $796,835,000,000.
Fiscal year 2034:
(A) New budget authority, $808,455,000,000.
(B) Outlays, $798,159,000,000.
(14) Social Security (650):
Fiscal year 2025:
(A) New budget authority, $67,259,000,000.
(B) Outlays, $67,259,000,000.
Fiscal year 2026:
(A) New budget authority, $81,690,000,000.
(B) Outlays, $81,690,000,000.
Fiscal year 2027:
(A) New budget authority, $89,447,000,000.
(B) Outlays, $89,447,000,000.
Fiscal year 2028:
(A) New budget authority, $94,419,000,000.
(B) Outlays, $94,419,000,000.
Fiscal year 2029:
(A) New budget authority, $100,138,000,000.
(B) Outlays, $100,138,000,000.
Fiscal year 2030:
(A) New budget authority, $106,208,000,000.
(B) Outlays, $106,208,000,000.
Fiscal year 2031:
(A) New budget authority, $112,114,000,000.
(B) Outlays, $112,114,000,000.
Fiscal year 2032:
(A) New budget authority, $118,485,000,000.
(B) Outlays, $118,485,000,000.
Fiscal year 2033:
(A) New budget authority, $125,325,000,000.
(B) Outlays, $125,325,000,000.
Fiscal year 2034:
(A) New budget authority, $132,539,000,000.
(B) Outlays, $132,539,000,000.
(15) Veterans Benefits and Services (700):
Fiscal year 2025:
(A) New budget authority, $361,349,000,000.
(B) Outlays, $357,760,000,000.
Fiscal year 2026:
(A) New budget authority, $382,555,000,000.
(B) Outlays, $378,814,000,000.
Fiscal year 2027:
(A) New budget authority, $404,594,000,000.
(B) Outlays, $401,319,000,000.
Fiscal year 2028:
(A) New budget authority, $427,329,000,000.
(B) Outlays, $444,241,000,000.
Fiscal year 2029:
(A) New budget authority, $447,757,000,000.
(B) Outlays, $422,317,000,000.
Fiscal year 2030:
(A) New budget authority, $466,616,000,000.
(B) Outlays, $461,720,000,000.
Fiscal year 2031:
(A) New budget authority, $486,716,000,000.
(B) Outlays, $481,638,000,000.
Fiscal year 2032:
(A) New budget authority, $507,187,000,000.
(B) Outlays, $502,655,000,000.
Fiscal year 2033:
(A) New budget authority, $528,733,000,000.
(B) Outlays, $548,734,000,000.
Fiscal year 2034:
(A) New budget authority, $550,662,000,000.
(B) Outlays, $547,796,000,000.
(16) Administration of Justice (750):
Fiscal year 2025:
(A) New budget authority, $83,111,000,000.
(B) Outlays, $85,235,000,000.
Fiscal year 2026:
(A) New budget authority, $88,992,000,000.
(B) Outlays, $87,024,000,000.
Fiscal year 2027:
(A) New budget authority, $87,701,000,000.
(B) Outlays, $86,420,000,000.
Fiscal year 2028:
(A) New budget authority, $89,687,000,000.
(B) Outlays, $88,514,000,000.
Fiscal year 2029:
(A) New budget authority, $92,142,000,000.
(B) Outlays, $90,690,000,000.
Fiscal year 2030:
(A) New budget authority, $94,574,000,000.
(B) Outlays, $92,986,000,000.
Fiscal year 2031:
(A) New budget authority, $96,848,000,000.
(B) Outlays, $94,869,000,000.
Fiscal year 2032:
(A) New budget authority, $104,463,000,000.
(B) Outlays, $101,844,000,000.
Fiscal year 2033:
(A) New budget authority, $107,160,000,000.
(B) Outlays, $104,339,000,000.
Fiscal year 2034:
(A) New budget authority, $109,431,000,000.
(B) Outlays, $106,934,000,000.
(17) General Government (800):
Fiscal year 2025:
(A) New budget authority, $10,089,000,000.
(B) Outlays, $37,960,000,000.
Fiscal year 2026:
(A) New budget authority, $30,666,000,000.
(B) Outlays, $38,285,000,000.
Fiscal year 2027:
(A) New budget authority, $32,065,000,000.
(B) Outlays, $38,261,000,000.
Fiscal year 2028:
(A) New budget authority, $32,994,000,000.
(B) Outlays, $37,957,000,000.
Fiscal year 2029:
(A) New budget authority, $33,770,000,000.
(B) Outlays, $37,793,000,000.
Fiscal year 2030:
(A) New budget authority, $34,614,000,000.
(B) Outlays, $37,985,000,000.
Fiscal year 2031:
(A) New budget authority, $35,247,000,000.
(B) Outlays, $37,024,000,000.
Fiscal year 2032:
(A) New budget authority, $36,189,000,000.
(B) Outlays, $36,307,000,000.
Fiscal year 2033:
(A) New budget authority, $36,960,000,000.
(B) Outlays, $36,758,000,000.
Fiscal year 2034:
(A) New budget authority, $37,681,000,000.
(B) Outlays, $37,266,000,000.
(18) Net Interest (900):
Fiscal year 2025:
(A) New budget authority, $1,011,643,000,000.
(B) Outlays, $1,011,643,000,000.
Fiscal year 2026:
(A) New budget authority, $1,031,561,000,000.
(B) Outlays, $1,031,561,000,000.
Fiscal year 2027:
(A) New budget authority, $1,078,839,000,000.
(B) Outlays, $1,078,839,000,000.
Fiscal year 2028:
(A) New budget authority, $1,150,343,000,000.
(B) Outlays, $1,150,343,000,000.
Fiscal year 2029:
(A) New budget authority, $1,213,150,000,000.
(B) Outlays, $1,213,150,000,000.
Fiscal year 2030:
(A) New budget authority, $1,269,439,000,000.
(B) Outlays, $1,269,439,000,000.
Fiscal year 2031:
(A) New budget authority, $1,332,808,000,000.
(B) Outlays, $1,332,808,000,000.
Fiscal year 2032:
(A) New budget authority, $1,398,649,000,000.
(B) Outlays, $1,398,649,000,000.
Fiscal year 2033:
(A) New budget authority, $1,457,676,000,000.
(B) Outlays, $1,457,676,000,000.
Fiscal year 2034:
(A) New budget authority, $1,525,604,000,000.
(B) Outlays, $1,525,604,000,000.
(19) Allowances (920):
Fiscal year 2025:
(A) New budget authority, −$1,009,217,000,000.
(B) Outlays, −$987,791,000,000.
Fiscal year 2026:
(A) New budget authority, −$888,800,000,000.
(B) Outlays, −$900,514,000,000.
Fiscal year 2027:
(A) New budget authority, −$890,385,000,000.
(B) Outlays, −$894,905,000,000.
Fiscal year 2028:
(A) New budget authority, −$848,052,000,000.
(B) Outlays, −$850,422,000,000.
Fiscal year 2029:
(A) New budget authority, −$851,534,000,000.
(B) Outlays, −$852,928,000,000.
Fiscal year 2030:
(A) New budget authority, −$874,353,000,000.
(B) Outlays, −$874,414,000,000.
Fiscal year 2031:
(A) New budget authority, −$874,523,000,000.
(B) Outlays, −$874,523,000,000.
Fiscal year 2032:
(A) New budget authority, −$894,135,000,000.
(B) Outlays, −$894,135,000,000.
Fiscal year 2033:
(A) New budget authority, −$940,797,000,000.
(B) Outlays, −$940,797,000,000.
Fiscal year 2034:
(A) New budget authority, −$913,790,000,000.
(B) Outlays, −$913,790,000,000.
(20) Undistributed Offsetting Receipts (950):
Fiscal year 2025:
(A) New budget authority, −$127,603,000,000.
(B) Outlays, −$127,603,000,000.
Fiscal year 2026:
(A) New budget authority, −$135,110,000,000.
(B) Outlays, −$135,110,000,000.
Fiscal year 2027:
(A) New budget authority, −$137,883,000,000.
(B) Outlays, −$137,883,000,000.
Fiscal year 2028:
(A) New budget authority, −$141,145,000,000.
(B) Outlays, −$141,165,000,000.
Fiscal year 2029:
(A) New budget authority, −$145,400,000,000.
(B) Outlays, −$145,407,000,000.
Fiscal year 2030:
(A) New budget authority, −$149,582,000,000.
(B) Outlays, −$149,581,000,000.
Fiscal year 2031:
(A) New budget authority, −$154,014,000,000.
(B) Outlays, −$154,013,000,000.
Fiscal year 2032:
(A) New budget authority, −$160,114,000,000.
(B) Outlays, −$160,113,000,000.
Fiscal year 2033:
(A) New budget authority, −$166,102,000,000.
(B) Outlays, −$166,101,000,000.
Fiscal year 2034:
(A) New budget authority, −$171,015,000,000.
(B) Outlays, −$171,014,000,000.
B Levels and amounts in the Senate
II Reconciliation
III Reserve funds
IV Other matters
V Policy statements in the House of Representatives