H.Con.Res. 14

Establishing the congressional budget for the United States Government for fiscal year 2025 and setting forth the appropriate budgetary levels for fiscal years 2026 through 2034.

Official summary

Written by the Congressional Research Service.

This concurrent resolution establishes the congressional budget for the federal government for FY2025, sets forth budgetary levels for FY2026-FY2034, and provides reconciliation instructions for legislation that increases or decreases the deficit and increases the statutory debt limit by specified amounts. 

The resolution recommends levels and amounts for FY2025-FY2034 for

  • federal revenues,
  • new budget authority,
  • budget outlays,
  • deficits,
  • debt subject to limit, 
  • debt held by the public, and
  • the major functional categories of spending.

The resolution includes reconciliation instructions that direct 11 House committees to submit legislation that will increase or decrease the deficit over FY2025-FY2034 and increase the statutory debt limit by specified amounts. The committees must submit the legislation to the House Budget Committee by March 27, 2025. 

(Under current law, reconciliation bills are considered by Congress using expedited legislative procedures that prevent a filibuster and restrict amendments in the Senate.)

In addition, the resolution establishes a reserve fund that allows certain adjustments to committee allocations and other budgetary levels to accommodate reconciliation legislation.

The resolution also requires the maximum deficit increase permitted by the reconciliation instruction for the House Ways and Means Committee ($4.5 trillion in the resolution) to be reduced if the proposals submitted by certain committees do not achieve a total of at least $2 trillion in net deficit reduction (or increased if more than $2 trillion in deficit reduction is achieved). 

Finally, the resolution sets forth budget enforcement procedures that address issues such as adjustments to committee allocations and the budgetary treatment of the discretionary administrative expenses for the Social Security Administration and the U.S. Postal Service. 

Text of the bill

Expand all

I Recommended levels and amounts

A Budgetary levels in both Houses

Sec. 1102. Major functional categories Changed · Apr 5, 2025

Where this section came from

  1. Feb 18, 2025 · Reported in House
  2. Apr 5, 2025 · Engrossed Amendment Senate S.Amdt. 2035: To establish a deficit-neutral reserve fund relating to protecting Medicare and Medicaid. Official page › S.Amdt. 1717: In the nature of a substitute. Official page › On the Motion to Proceed — Motion to Proceed Agreed to, 52–48 · Roll Call 169On the Amendment — Amendment Agreed to, 51–48 · Roll Call 170On the Amendment — Amendment Rejected, 46–53 · Roll Call 171On the Amendment — Amendment Rejected, 48–51 · Roll Call 172On the Amendment — Amendment Rejected, 47–51 · Roll Call 173On the Amendment — Amendment Rejected, 46–53 · Roll Call 174On the Amendment — Amendment Rejected, 48–51 · Roll Call 175On the Amendment — Amendment Rejected, 46–53 · Roll Call 176On the Amendment — Amendment Rejected, 48–51 · Roll Call 177On the Amendment — Amendment Rejected, 48–51 · Roll Call 178On the Amendment — Amendment Rejected, 5–94 · Roll Call 179On the Amendment — Amendment Rejected, 49–50 · Roll Call 180On the Amendment — Amendment Rejected, 48–51 · Roll Call 181On the Amendment — Amendment Rejected, 48–51 · Roll Call 182On the Amendment — Amendment Rejected, 49–50 · Roll Call 183On the Amendment — Amendment Rejected, 47–52 · Roll Call 184On the Motion — Motion Rejected, 49–50 · Roll Call 185On the Amendment — Amendment Rejected, 49–50 · Roll Call 186On the Amendment — Amendment Rejected, 48–51 · Roll Call 187On the Amendment — Amendment Rejected, 48–51 · Roll Call 188On the Amendment — Amendment Rejected, 49–50 · Roll Call 189On the Amendment — Amendment Rejected, 47–52 · Roll Call 190On the Concurrent Resolution — Concurrent Resolution Agreed to, 51–48 · Roll Call 191
What changed in the text

… 3 unchanged passages …

(A) New budget authority, $ 888 933 , 044 484 ,000,000. (B) Outlays, $ 883 909 , 821 629 ,000,000.

Fiscal year 2026:

(A) New budget authority, $ 913 901 , 263 220 ,000,000. (B) Outlays, $ 895 904 , 830 412 ,000,000.

Fiscal year 2027:

(A) New budget authority, $ 935 923 , 345 020 ,000,000. (B) Outlays, $ 913 911 , 493 956 ,000,000.

Fiscal year 2028:

(A) New budget authority, $ 956 944 , 694 111 ,000,000. (B) Outlays, $ 940 934 , 299 660 ,000,000.

Fiscal year 2029:

(A) New budget authority, $ 979 966 , 049 203 ,000,000. (B) Outlays, $ 950 942 , 598 419 ,000,000.

Fiscal year 2030:

(A) New budget authority, $ 1 989 , 002 212 , 337, 000,000. (B) Outlays, $ 977 966 , 233 361 ,000,000.

Fiscal year 2031:

(A) New budget authority, $1, 026 012 , 119 715 ,000,000. (B) Outlays, $ 996 984 , 535 795 ,000,000.

Fiscal year 2032:

(A) New budget authority, $1, 050 036 , 408 723 ,000,000. (B) Outlays, $1, 016 003 , 235 888 ,000,000.

Fiscal year 2033:

(A) New budget authority, $1, 076 062 , 299 319 ,000,000. (B) Outlays, $1, 050 037 , 728 888 ,000,000.

Fiscal year 2034:

(A) New budget authority, $1, 101 087 , 659 382 ,000,000. (B) Outlays, $1, 067 054 , 701 430 ,000,000.

… 5 unchanged passages …

(A) New budget authority, $ 64 61 , 270 716 ,000,000. (B) Outlays, $ 68 67 , 458 669 ,000,000.

Fiscal year 2027:

(A) New budget authority, $ 64 62 , 856 249 ,000,000. (B) Outlays, $ 68 66 , 013 456 ,000,000.

Fiscal year 2028:

(A) New budget authority, $ 66 63 , 169 512 ,000,000. (B) Outlays, $ 64 62 , 433 391 ,000,000.

Fiscal year 2029:

(A) New budget authority, $ 67 64 , 655 944 ,000,000. (B) Outlays, $ 65 62 , 177 832 ,000,000.

Fiscal year 2030:

(A) New budget authority, $ 69 66 , 175 408 ,000,000. (B) Outlays, $ 65 63 , 601 077 ,000,000.

Fiscal year 2031:

(A) New budget authority, $ 70 67 , 699 878 ,000,000. (B) Outlays, $ 66 64 , 643 002 ,000,000.

Fiscal year 2032:

(A) New budget authority, $ 72 69 , 220 343 ,000,000. (B) Outlays, $ 67 65 , 916 176 ,000,000.

Fiscal year 2033:

(A) New budget authority, $ 73 70 , 809 874 ,000,000. (B) Outlays, $ 69 66 , 332 517 ,000,000.

Fiscal year 2034:

(A) New budget authority, $ 75 72 , 431 435 ,000,000. (B) Outlays, $ 70 67 , 768 889 ,000,000.

… 5 unchanged passages …

(A) New budget authority, $ 43 41 , 056 345 ,000,000. (B) Outlays, $ 42 41 , 483 844 ,000,000.

Fiscal year 2027:

(A) New budget authority, $ 44 42 , 011 264 ,000,000. (B) Outlays, $ 43 41 , 166 923 ,000,000.

Fiscal year 2028:

(A) New budget authority, $ 44 43 , 881 099 ,000,000. (B) Outlays, $ 43 42 , 781 198 ,000,000.

Fiscal year 2029:

(A) New budget authority, $ 45 44 , 834 017 ,000,000. (B) Outlays, $ 44 42 , 611 887 ,000,000.

Fiscal year 2030:

(A) New budget authority, $ 46 44 , 835 980 ,000,000. (B) Outlays, $ 45 43 , 450 633 ,000,000.

Fiscal year 2031:

(A) New budget authority, $ 47 45 , 840 946 ,000,000. (B) Outlays, $ 46 44 , 405 551 ,000,000.

Fiscal year 2032:

(A) New budget authority, $ 48 46 , 853 922 ,000,000. (B) Outlays, $ 47 45 , 377 486 ,000,000.

Fiscal year 2033:

(A) New budget authority, $ 49 47 , 907 936 ,000,000. (B) Outlays, $ 48 46 , 391 460 ,000,000.

Fiscal year 2034:

(A) New budget authority, $ 50 48 , 997 985 ,000,000. (B) Outlays, $ 49 47 , 436 466 ,000,000.

… 5 unchanged passages …

(A) New budget authority, $ 40 39 , 172 958 ,000,000. (B) Outlays, $44, 518 514 ,000,000.

Fiscal year 2027:

(A) New budget authority, $ 43 34 , 579 098 ,000,000. (B) Outlays, $52, 928 768 ,000,000.

Fiscal year 2028:

(A) New budget authority, $ 44 34 , 493 825 ,000,000. (B) Outlays, $ 52 51 , 542 623 ,000,000.

Fiscal year 2029:

(A) New budget authority, $ 45 35 , 633 770 ,000,000. (B) Outlays, $ 51 48 , 237 582 ,000,000.

Fiscal year 2030:

(A) New budget authority, $ 44 33 , 014 946 ,000,000. (B) Outlays, $ 47 42 , 297 596 ,000,000.

Fiscal year 2031:

(A) New budget authority, $ 45 35 , 460 188 ,000,000. (B) Outlays, $ 46 40 , 521 366 ,000,000.

Fiscal year 2032:

(A) New budget authority, $ 50 39 , 176 697 ,000,000. (B) Outlays, $ 48 41 , 864 611 ,000,000.

Fiscal year 2033:

(A) New budget authority, $ 35 24 , 184 489 ,000,000. (B) Outlays, $ 34 25 , 040 941 ,000,000.

Fiscal year 2034:

(A) New budget authority, $ 27 16 , 122 203 ,000,000. (B) Outlays, $ 26 17 , 021 040 ,000,000.

… 2 unchanged passages …

(A) New budget authority, $88, 219 319 ,000,000. (B) Outlays, $ 90 89 , 074 764 ,000,000.

Fiscal year 2026:

(A) New budget authority, $ 89 67 , 760 633 ,000,000. (B) Outlays, $ 90 80 , 428 552 ,000,000.

Fiscal year 2027:

(A) New budget authority, $ 83 45 , 830 140 ,000,000. (B) Outlays, $ 91 75 , 282 844 ,000,000.

Fiscal year 2028:

(A) New budget authority, $ 85 45 , 498 985 ,000,000. (B) Outlays, $ 91 71 , 754 673 ,000,000.

Fiscal year 2029:

(A) New budget authority, $ 87 46 , 319 956 ,000,000. (B) Outlays, $ 92 67 , 172 691 ,000,000.

Fiscal year 2030:

(A) New budget authority, $ 88 47 , 970 707 ,000,000. (B) Outlays, $ 92 63 , 442 948 ,000,000.

Fiscal year 2031:

(A) New budget authority, $ 91 48 , 016 854 ,000,000. (B) Outlays, $ 92 60 , 640 580 ,000,000.

Fiscal year 2032:

(A) New budget authority, $ 92 49 , 975 918 ,000,000. (B) Outlays, $ 91 56 , 686 444 ,000,000.

Fiscal year 2033:

(A) New budget authority, $ 95 51 , 254 246 ,000,000. (B) Outlays, $ 93 55 , 640 797 ,000,000.

Fiscal year 2034:

(A) New budget authority, $ 97 52 , 211 225 ,000,000. (B) Outlays, $ 94 55 , 831 480 ,000,000.

… 5 unchanged passages …

(A) New budget authority, $ 59 28 , 875 163 ,000,000. (B) Outlays, $ 58 46 , 018 212 ,000,000.

Fiscal year 2027:

(A) New budget authority, $ 64 31 , 092 716 ,000,000. (B) Outlays, $ 61 33 , 792 686 ,000,000.

Fiscal year 2028:

(A) New budget authority, $ 66 33 , 014 008 ,000,000. (B) Outlays, $ 64 34 , 140 426 ,000,000.

Fiscal year 2029:

(A) New budget authority, $ 66 33 , 999 334 ,000,000. (B) Outlays, $ 63 32 , 775 441 ,000,000.

Fiscal year 2030:

(A) New budget authority, $ 65 30 , 213 857 ,000,000. (B) Outlays, $ 62 30 , 065 098 ,000,000.

Fiscal year 2031:

(A) New budget authority, $ 65 30 , 516 468 ,000,000. (B) Outlays, $ 62 29 , 226 609 ,000,000.

Fiscal year 2032:

(A) New budget authority, $ 66 31 , 979 239 ,000,000. (B) Outlays, $ 63 30 , 432 163 ,000,000.

Fiscal year 2033:

(A) New budget authority, $ 68 32 , 738 276 ,000,000. (B) Outlays, $ 64 30 , 825 893 ,000,000.

Fiscal year 2034:

(A) New budget authority, $ 70 32 , 130 912 ,000,000. (B) Outlays, $ 66 31 , 347 721 ,000,000.

… 3 unchanged passages …

(B) Outlays, -$ −$ 18,175,000,000.

Fiscal year 2026:

(A) New budget authority, $ 33 32 , 817 747 ,000,000. (B) Outlays, -$207 −$626 ,000,000.

Fiscal year 2027:

(A) New budget authority, $ 29 28 , 807 145 ,000,000. (B) Outlays, $ 8 7 , 387 710 ,000,000.

Fiscal year 2028:

(A) New budget authority, -$55 −$56 , 092 796 ,000,000. (B) Outlays, -$64 −$65 , 213 194 ,000,000.

Fiscal year 2029:

(A) New budget authority, $ 27 25 , 308 562 ,000,000. (B) Outlays, $ 17 15 , 149 976 ,000,000.

Fiscal year 2030:

(A) New budget authority, $ 27 25 , 501 712 ,000,000. (B) Outlays, $ 14 12 , 043 680 ,000,000.

Fiscal year 2031:

(A) New budget authority, $ 27 25 , 776 941 ,000,000. (B) Outlays, $ 9 7 , 486 932 ,000,000.

Fiscal year 2032:

(A) New budget authority, $ 28 26 , 233 354 ,000,000. (B) Outlays, $ 6 5 , 788 060 ,000,000.

Fiscal year 2033:

(A) New budget authority, $ 22 20 , 118 192 ,000,000. (B) Outlays, -$2 −$4 , 412 224 ,000,000.

Fiscal year 2034:

(A) New budget authority, $ 31 29 , 836 862 ,000,000. (B) Outlays, $ 4 2 , 308 451 ,000,000.

… 5 unchanged passages …

(A) New budget authority, $ 176 167 , 249 673 ,000,000. (B) Outlays, $ 154 152 , 625 541 ,000,000.

Fiscal year 2027:

(A) New budget authority, $ 178 132 , 411 085 ,000,000. (B) Outlays, $ 162 158 , 925 068 ,000,000.

Fiscal year 2028:

(A) New budget authority, $ 180 133 , 607 386 ,000,000. (B) Outlays, $ 171 162 , 610 528 ,000,000.

Fiscal year 2029:

(A) New budget authority, $ 182 134 , 610 447 ,000,000. (B) Outlays, $ 175 160 , 967 846 ,000,000.

Fiscal year 2030:

(A) New budget authority, $ 179 129 , 144 994 ,000,000. (B) Outlays, $ 174 150 , 442 790 ,000,000.

Fiscal year 2031:

(A) New budget authority, $ 181 130 , 099 964 ,000,000. (B) Outlays, $ 178 147 , 314 539 ,000,000.

Fiscal year 2032:

(A) New budget authority, $ 189 138 , 966 846 ,000,000. (B) Outlays, $ 187 150 , 367 163 ,000,000.

Fiscal year 2033:

(A) New budget authority, $ 192 140 , 692 544 ,000,000. (B) Outlays, $ 191 149 , 213 247 ,000,000.

Fiscal year 2034:

(A) New budget authority, $ 195 142 , 495 271 ,000,000. (B) Outlays, $ 194 149 , 754 454 ,000,000.

… 2 unchanged passages …

(A) New budget authority, $ 87 90 , 762 242 ,000,000. (B) Outlays, $78, 752 592 ,000,000.

Fiscal year 2026:

(A) New budget authority, $ 89 20 , 366 135 ,000,000. (B) Outlays, $ 69 64 , 845 267 ,000,000.

Fiscal year 2027:

(A) New budget authority, $ 91 19 , 267 259 ,000,000. (B) Outlays, $ 74 56 , 426 506 ,000,000.

Fiscal year 2028:

(A) New budget authority, $ 92 19 , 897 462 ,000,000. (B) Outlays, $ 75 45 , 604 101 ,000,000.

Fiscal year 2029:

(A) New budget authority, $ 94 19 , 812 888 ,000,000. (B) Outlays, $ 77 35 , 850 976 ,000,000.

Fiscal year 2030:

(A) New budget authority, $ 96 20 , 811 326 ,000,000. (B) Outlays, $ 82 31 , 903 026 ,000,000.

Fiscal year 2031:

(A) New budget authority, $ 98 20 , 774 727 ,000,000. (B) Outlays, $ 86 27 , 364 543 ,000,000.

Fiscal year 2032:

(A) New budget authority, $ 100 21 , 621 007 ,000,000. (B) Outlays, $ 88 24 , 685 658 ,000,000.

Fiscal year 2033:

(A) New budget authority, $ 102 21 , 711 462 ,000,000. (B) Outlays, $ 90 22 , 723 754 ,000,000.

Fiscal year 2034:

(A) New budget authority, $ 104 21 , 818 864 ,000,000. (B) Outlays, $ 93 21 , 005 733 ,000,000.

… 2 unchanged passages …

(A) New budget authority, $149, 303 379 ,000,000. (B) Outlays, $171, 916 920 ,000,000.

… 2 unchanged passages …

(B) Outlays, $151, 605 639 ,000,000.

Fiscal year 2027:

(A) New budget authority, $155, 153 152 ,000,000. (B) Outlays, $ 150 151 , 979 206 ,000,000.

Fiscal year 2028:

(A) New budget authority, $157, 971 970 ,000,000. (B) Outlays, $152, 819 914 ,000,000.

Fiscal year 2029:

(A) New budget authority, $160, 952 942 ,000,000. (B) Outlays, $155, 502 518 ,000,000.

Fiscal year 2030:

(A) New budget authority, $163, 865 842 ,000,000. (B) Outlays, $158, 383 366 ,000,000.

Fiscal year 2031:

(A) New budget authority, $166, 854 812 ,000,000. (B) Outlays, $161, 312 277 ,000,000.

Fiscal year 2032:

(A) New budget authority, $170, 223 169 ,000,000. (B) Outlays, $164, 486 438 ,000,000.

Fiscal year 2033:

(A) New budget authority, $173, 784 711 ,000,000. (B) Outlays, $167, 792 726 ,000,000.

Fiscal year 2034:

(A) New budget authority, $176, 834 750 ,000,000. (B) Outlays, $170, 876 798 ,000,000.

… 2 unchanged passages …

(A) New budget authority, $ 945 948 , 070 957 ,000,000. (B) Outlays, $ 961 963 , 180 482 ,000,000.

Fiscal year 2026:

(A) New budget authority, $992, 460 092 ,000,000. (B) Outlays, $ 976 977 , 705 707 ,000,000.

Fiscal year 2027:

(A) New budget authority, $1, 021 020 , 428 326 ,000,000. (B) Outlays, $1,021, 884 663 ,000,000.

Fiscal year 2028:

(A) New budget authority, $1, 056 054 , 522 949 ,000,000. (B) Outlays, $1, 053 051 , 318 917 ,000,000.

Fiscal year 2029:

(A) New budget authority, $1, 099 098 , 999 389 ,000,000. (B) Outlays, $1, 095 093 , 100 560 ,000,000.

Fiscal year 2030:

(A) New budget authority, $1, 144 142 , 066 669 ,000,000. (B) Outlays, $1, 133 132 , 456 096 ,000,000.

Fiscal year 2031:

(A) New budget authority, $1, 177 176 , 723 497 ,000,000. (B) Outlays, $1, 176 175 , 648 451 ,000,000.

Fiscal year 2032:

(A) New budget authority, $1, 228 226 , 051 824 ,000,000. (B) Outlays, $1, 218 216 , 203 998 ,000,000.

Fiscal year 2033:

(A) New budget authority, $1, 278 276 , 134 881 ,000,000. (B) Outlays, $1, 267 266 , 299 068 ,000,000.

Fiscal year 2034:

(A) New budget authority, $1, 311 310 , 280 000 ,000,000. (B) Outlays, $1, 300 298 , 233 975 ,000,000.

… 2 unchanged passages …

(A) New budget authority, $ 950 952 , 891 239 ,000,000. (B) Outlays, $ 950 951 , 641 989 ,000,000.

Fiscal year 2026:

(A) New budget authority, $1,007, 431 093 ,000,000. (B) Outlays, $1, 009 008 , 161 459 ,000,000.

Fiscal year 2027:

(A) New budget authority, $1, 067 066 , 229 571 ,000,000. (B) Outlays, $1,066, 832 331 ,000,000.

Fiscal year 2028:

(A) New budget authority, $1, 210 209 , 420 735 ,000,000. (B) Outlays, $1,208, 952 675 ,000,000.

Fiscal year 2029:

(A) New budget authority, $1, 126 125 , 357 645 ,000,000. (B) Outlays, $1,125, 928 301 ,000,000.

Fiscal year 2030:

(A) New budget authority, $1, 276 275 , 602 864 ,000,000. (B) Outlays, $1, 276 275 , 291 627 ,000,000.

Fiscal year 2031:

(A) New budget authority, $1, 358 357 , 554 791 ,000,000. (B) Outlays, $1, 358 357 , 476 726 ,000,000.

Fiscal year 2032:

(A) New budget authority, $1,445, 982 195 ,000,000. (B) Outlays, $1,445, 966 191 ,000,000.

Fiscal year 2033:

(A) New budget authority, $1, 664 659 , 590 329 ,000,000. (B) Outlays, $1, 664 659 , 595 346 ,000,000.

Fiscal year 2034:

(A) New budget authority, $1, 667 666 , 328 492 ,000,000. (B) Outlays, $1, 667 666 , 321 497 ,000,000.

… 2 unchanged passages …

(A) New budget authority, $712, 446 538 ,000,000. (B) Outlays, $709, 132 200 ,000,000.

Fiscal year 2026:

(A) New budget authority, $ 702 691 , 007 755 ,000,000. (B) Outlays, $ 699 690 , 086 914 ,000,000.

Fiscal year 2027:

(A) New budget authority, $ 703 708 , 592 645 ,000,000. (B) Outlays, $ 698 703 , 238 648 ,000,000.

Fiscal year 2028:

(A) New budget authority, $ 722 727 , 280 434 ,000,000. (B) Outlays, $ 721 727 , 948 234 ,000,000.

Fiscal year 2029:

(A) New budget authority, $ 724 728 , 420 925 ,000,000. (B) Outlays, $ 710 714 , 279 850 ,000,000.

Fiscal year 2030:

(A) New budget authority, $ 743 748 , 824 162 ,000,000. (B) Outlays, $ 735 739 , 068 465 ,000,000.

Fiscal year 2031:

(A) New budget authority, $ 757 760 , 021 737 ,000,000. (B) Outlays, $ 747 751 , 723 498 ,000,000.

Fiscal year 2032:

(A) New budget authority, $ 775 778 , 456 878 ,000,000. (B) Outlays, $ 765 768 , 416 898 ,000,000.

Fiscal year 2033:

(A) New budget authority, $ 796 800 , 775 142 ,000,000. (B) Outlays, $ 793 796 , 408 835 ,000,000.

Fiscal year 2034:

(A) New budget authority, $ 805 808 , 597 455 ,000,000. (B) Outlays, $ 795 798 , 238 159 ,000,000.

… 36 unchanged passages …

(A) New budget authority, $382, 625 555 ,000,000. (B) Outlays, $378, 862 814 ,000,000.

Fiscal year 2027:

(A) New budget authority, $404, 665 594 ,000,000. (B) Outlays, $401, 379 319 ,000,000.

Fiscal year 2028:

(A) New budget authority, $427, 402 329 ,000,000. (B) Outlays, $444, 309 241 ,000,000.

Fiscal year 2029:

(A) New budget authority, $447, 832 757 ,000,000. (B) Outlays, $422, 387 317 ,000,000.

Fiscal year 2030:

(A) New budget authority, $466, 693 616 ,000,000. (B) Outlays, $461, 795 720 ,000,000.

Fiscal year 2031:

(A) New budget authority, $486, 796 716 ,000,000. (B) Outlays, $481, 715 638 ,000,000.

Fiscal year 2032:

(A) New budget authority, $507, 269 187 ,000,000. (B) Outlays, $502, 734 655 ,000,000.

Fiscal year 2033:

(A) New budget authority, $528, 816 733 ,000,000. (B) Outlays, $548, 814 734 ,000,000.

Fiscal year 2034:

(A) New budget authority, $550, 747 662 ,000,000. (B) Outlays, $547, 878 796 ,000,000.

… 5 unchanged passages …

(A) New budget authority, $ 90 88 , 002 992 ,000,000. (B) Outlays, $87, 682 024 ,000,000.

Fiscal year 2027:

(A) New budget authority, $ 89 87 , 047 701 ,000,000. (B) Outlays, $ 87 86 , 256 420 ,000,000.

Fiscal year 2028:

(A) New budget authority, $ 91 89 , 066 687 ,000,000. (B) Outlays, $ 89 88 , 499 514 ,000,000.

Fiscal year 2029:

(A) New budget authority, $ 93 92 , 553 142 ,000,000. (B) Outlays, $ 91 90 , 849 690 ,000,000.

Fiscal year 2030:

(A) New budget authority, $ 96 94 , 019 574 ,000,000. (B) Outlays, $ 94 92 , 292 986 ,000,000.

Fiscal year 2031:

(A) New budget authority, $ 98 96 , 328 848 ,000,000. (B) Outlays, $ 96 94 , 277 869 ,000,000.

Fiscal year 2032:

(A) New budget authority, $ 105 104 , 979 463 ,000,000. (B) Outlays, $ 103 101 , 293 844 ,000,000.

Fiscal year 2033:

(A) New budget authority, $ 108 107 , 710 160 ,000,000. (B) Outlays, $ 105 104 , 827 339 ,000,000.

Fiscal year 2034:

(A) New budget authority, $ 111 109 , 020 431 ,000,000. (B) Outlays, $ 108 106 , 460 934 ,000,000.

… 5 unchanged passages …

(A) New budget authority, $30, 678 666 ,000,000. (B) Outlays, $38, 289 285 ,000,000.

Fiscal year 2027:

(A) New budget authority, $32, 078 065 ,000,000. (B) Outlays, $38, 267 261 ,000,000.

Fiscal year 2028:

(A) New budget authority, $ 33 32 , 007 994 ,000,000. (B) Outlays, $37, 965 957 ,000,000.

Fiscal year 2029:

(A) New budget authority, $33, 784 770 ,000,000. (B) Outlays, $37, 804 793 ,000,000.

Fiscal year 2030:

(A) New budget authority, $34, 628 614 ,000,000. (B) Outlays, $37, 998 985 ,000,000.

Fiscal year 2031:

(A) New budget authority, $35, 261 247 ,000,000. (B) Outlays, $37, 038 024 ,000,000.

Fiscal year 2032:

(A) New budget authority, $36, 204 189 ,000,000. (B) Outlays, $36, 321 307 ,000,000.

Fiscal year 2033:

(A) New budget authority, $36, 975 960 ,000,000. (B) Outlays, $36, 772 758 ,000,000.

Fiscal year 2034:

(A) New budget authority, $37, 697 681 ,000,000. (B) Outlays, $37, 281 266 ,000,000.

… 2 unchanged passages …

(A) New budget authority, $1, 027 011 , 694 643 ,000,000. (B) Outlays, $1, 027 011 , 694 643 ,000,000.

Fiscal year 2026:

(A) New budget authority, $1, 090 031 , 880 561 ,000,000. (B) Outlays, $1, 090 031 , 880 561 ,000,000.

Fiscal year 2027:

(A) New budget authority, $1, 160 078 , 719 839 ,000,000. (B) Outlays, $1, 160 078 , 719 839 ,000,000.

Fiscal year 2028:

(A) New budget authority, $1, 250 150 , 257 343 ,000,000. (B) Outlays, $1, 250 150 , 257 343 ,000,000.

Fiscal year 2029:

(A) New budget authority, $1, 328 213 , 362 150 ,000,000. (B) Outlays, $1, 328 213 , 362 150 ,000,000.

Fiscal year 2030:

(A) New budget authority, $1, 399 269 , 636 439 ,000,000. (B) Outlays, $1, 399 269 , 636 439 ,000,000.

Fiscal year 2031:

(A) New budget authority, $1, 475 332 , 634 808 ,000,000. (B) Outlays, $1, 475 332 , 634 808 ,000,000.

Fiscal year 2032:

(A) New budget authority, $1, 551 398 , 786 649 ,000,000. (B) Outlays, $1, 551 398 , 786 649 ,000,000.

Fiscal year 2033:

(A) New budget authority, $1, 619 457 , 496 676 ,000,000. (B) Outlays, $1, 619 457 , 496 676 ,000,000.

Fiscal year 2034:

(A) New budget authority, $1, 693 525 , 863 604 ,000,000. (B) Outlays, $1, 693 525 , 863 604 ,000,000.

… 2 unchanged passages …

(A) New budget authority, $0 −$1,009,217,000,000 . (B) Outlays, $0 −$987,791,000,000 .

Fiscal year 2026:

(A) New budget authority, $0 −$888,800,000,000 . (B) Outlays, $0 −$900,514,000,000 .

Fiscal year 2027:

(A) New budget authority, $0 −$890,385,000,000 . (B) Outlays, $0 −$894,905,000,000 .

Fiscal year 2028:

(A) New budget authority, $0 −$848,052,000,000 . (B) Outlays, $0 −$850,422,000,000 .

Fiscal year 2029:

(A) New budget authority, $0 −$851,534,000,000 . (B) Outlays, $0 −$852,928,000,000 .

Fiscal year 2030:

(A) New budget authority, $0 −$874,353,000,000 . (B) Outlays, $0 −$874,414,000,000 .

Fiscal year 2031:

(A) New budget authority, $0 −$874,523,000,000 . (B) Outlays, $0 −$874,523,000,000 .

Fiscal year 2032:

(A) New budget authority, $0 −$894,135,000,000 . (B) Outlays, $0 −$894,135,000,000 .

Fiscal year 2033:

(A) New budget authority, $0 −$940,797,000,000 . (B) Outlays, $0 −$940,797,000,000 .

Fiscal year 2034:

(A) New budget authority, $0 −$913,790,000,000 . (B) Outlays, $0 −$913,790,000,000 . (20) Government-Wide Undistributed Savings Offsetting Receipts ( 930 950 ):

Fiscal year 2025:

(A) New budget authority, -$120 −$127 , 000 603 ,000,000. (B) Outlays, -$120 −$127 , 000 603 ,000,000.

Fiscal year 2026:

(A) New budget authority, -$299 −$135 , 849 110 ,000,000. (B) Outlays, -$179 −$135 , 763 110 ,000,000.

Fiscal year 2027:

(A) New budget authority, -$375 −$137 , 694 883 ,000,000. (B) Outlays, -$231 −$137 , 910 883 ,000,000.

Fiscal year 2028:

(A) New budget authority, -$384 −$141 , 958 145 ,000,000. (B) Outlays, -$263 −$141 , 939 165 ,000,000.

Fiscal year 2029:

(A) New budget authority, -$393 −$145 , 736 400 ,000,000. (B) Outlays, -$296 −$145 , 185 407 ,000,000.

Fiscal year 2030:

(A) New budget authority, -$407 −$149 , 056 582 ,000,000. (B) Outlays, -$330 −$149 , 476 581 ,000,000.

Fiscal year 2031:

(A) New budget authority, -$419 −$154 , 698 014 ,000,000. (B) Outlays, -$357 −$154 , 567 013 ,000,000.

Fiscal year 2032:

(A) New budget authority, -$431 −$160 , 652 114 ,000,000. (B) Outlays, -$381 −$160 , 290 113 ,000,000.

Fiscal year 2033:

(A) New budget authority, -$445 −$166 , 094 102 ,000,000. (B) Outlays, -$402 −$166 , 008 101 ,000,000.

Fiscal year 2034:

(A) New budget authority, -$460 −$171 , 001 015 ,000,000. (B) Outlays, -$420,590,000,000. (21) Undistributed Offsetting Receipts (950): Fiscal year 2025: (A) New budget authority, -$127,603,000,000. (B) Outlays, -$127,603,000,000. Fiscal year 2026: (A) New budget authority, -$135,110,000,000. (B) Outlays, -$135,110,000,000. Fiscal year 2027: (A) New budget authority, -$137,883,000,000. (B) Outlays, -$137,883,000,000. Fiscal year 2028: (A) New budget authority, -$141,145,000,000. (B) Outlays, -$141,165,000,000. Fiscal year 2029: (A) New budget authority, -$145,400,000,000. (B) Outlays, -$145,407,000,000. Fiscal year 2030: (A) New budget authority, -$149,582,000,000. (B) Outlays, -$149,581,000,000. Fiscal year 2031: (A) New budget authority, -$154,014,000,000. (B) Outlays, -$154,013,000,000. Fiscal year 2032: (A) New budget authority, -$160,114,000,000. (B) Outlays, -$160,113,000,000. Fiscal year 2033: (A) New budget authority, -$166,102,000,000. (B) Outlays, -$166,101,000,000. Fiscal year 2034: (A) New budget authority, -$ −$ 171, 015,000,000. (B) Outlays,-$171, 014,000,000. (22) Across-the-Board Adjustment (990): Fiscal year 2025: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2026: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2027: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2028: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2029: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2030: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2031: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2032: (A) New budget authority, -$4,000,000. (B) Outlays, $0. Fiscal year 2033: (A) New budget authority, -$5,000,000. (B) Outlays, $0. Fiscal year 2034: (A) New budget authority, -$5,000,000. (B) Outlays, $0.

Congress determines and declares that the appropriate levels of new budget authority and outlays for fiscal years 2025 through 2034 for each major functional category are:

(1) National Defense (050):

Fiscal year 2025:

(A) New budget authority, $933,484,000,000.

(B) Outlays, $909,629,000,000.

Fiscal year 2026:

(A) New budget authority, $901,220,000,000.

(B) Outlays, $904,412,000,000.

Fiscal year 2027:

(A) New budget authority, $923,020,000,000.

(B) Outlays, $911,956,000,000.

Fiscal year 2028:

(A) New budget authority, $944,111,000,000.

(B) Outlays, $934,660,000,000.

Fiscal year 2029:

(A) New budget authority, $966,203,000,000.

(B) Outlays, $942,419,000,000.

Fiscal year 2030:

(A) New budget authority, $989,212,000,000.

(B) Outlays, $966,361,000,000.

Fiscal year 2031:

(A) New budget authority, $1,012,715,000,000.

(B) Outlays, $984,795,000,000.

Fiscal year 2032:

(A) New budget authority, $1,036,723,000,000.

(B) Outlays, $1,003,888,000,000.

Fiscal year 2033:

(A) New budget authority, $1,062,319,000,000.

(B) Outlays, $1,037,888,000,000.

Fiscal year 2034:

(A) New budget authority, $1,087,382,000,000.

(B) Outlays, $1,054,430,000,000.

(2) International Affairs (150):

Fiscal year 2025:

(A) New budget authority, $65,962,000,000.

(B) Outlays, $69,206,000,000.

Fiscal year 2026:

(A) New budget authority, $61,716,000,000.

(B) Outlays, $67,669,000,000.

Fiscal year 2027:

(A) New budget authority, $62,249,000,000.

(B) Outlays, $66,456,000,000.

Fiscal year 2028:

(A) New budget authority, $63,512,000,000.

(B) Outlays, $62,391,000,000.

Fiscal year 2029:

(A) New budget authority, $64,944,000,000.

(B) Outlays, $62,832,000,000.

Fiscal year 2030:

(A) New budget authority, $66,408,000,000.

(B) Outlays, $63,077,000,000.

Fiscal year 2031:

(A) New budget authority, $67,878,000,000.

(B) Outlays, $64,002,000,000.

Fiscal year 2032:

(A) New budget authority, $69,343,000,000.

(B) Outlays, $65,176,000,000.

Fiscal year 2033:

(A) New budget authority, $70,874,000,000.

(B) Outlays, $66,517,000,000.

Fiscal year 2034:

(A) New budget authority, $72,435,000,000.

(B) Outlays, $67,889,000,000.

(3) General Science, Space, and Technology (250):

Fiscal year 2025:

(A) New budget authority, $42,084,000,000.

(B) Outlays, $41,734,000,000.

Fiscal year 2026:

(A) New budget authority, $41,345,000,000.

(B) Outlays, $41,844,000,000.

Fiscal year 2027:

(A) New budget authority, $42,264,000,000.

(B) Outlays, $41,923,000,000.

Fiscal year 2028:

(A) New budget authority, $43,099,000,000.

(B) Outlays, $42,198,000,000.

Fiscal year 2029:

(A) New budget authority, $44,017,000,000.

(B) Outlays, $42,887,000,000.

Fiscal year 2030:

(A) New budget authority, $44,980,000,000.

(B) Outlays, $43,633,000,000.

Fiscal year 2031:

(A) New budget authority, $45,946,000,000.

(B) Outlays, $44,551,000,000.

Fiscal year 2032:

(A) New budget authority, $46,922,000,000.

(B) Outlays, $45,486,000,000.

Fiscal year 2033:

(A) New budget authority, $47,936,000,000.

(B) Outlays, $46,460,000,000.

Fiscal year 2034:

(A) New budget authority, $48,985,000,000.

(B) Outlays, $47,466,000,000.

(4) Energy (270):

Fiscal year 2025:

(A) New budget authority, $39,842,000,000.

(B) Outlays, $37,587,000,000.

Fiscal year 2026:

(A) New budget authority, $39,958,000,000.

(B) Outlays, $44,514,000,000.

Fiscal year 2027:

(A) New budget authority, $34,098,000,000.

(B) Outlays, $52,768,000,000.

Fiscal year 2028:

(A) New budget authority, $34,825,000,000.

(B) Outlays, $51,623,000,000.

Fiscal year 2029:

(A) New budget authority, $35,770,000,000.

(B) Outlays, $48,582,000,000.

Fiscal year 2030:

(A) New budget authority, $33,946,000,000.

(B) Outlays, $42,596,000,000.

Fiscal year 2031:

(A) New budget authority, $35,188,000,000.

(B) Outlays, $40,366,000,000.

Fiscal year 2032:

(A) New budget authority, $39,697,000,000.

(B) Outlays, $41,611,000,000.

Fiscal year 2033:

(A) New budget authority, $24,489,000,000.

(B) Outlays, $25,941,000,000.

Fiscal year 2034:

(A) New budget authority, $16,203,000,000.

(B) Outlays, $17,040,000,000.

(5) Natural Resources and Environment (300):

Fiscal year 2025:

(A) New budget authority, $88,319,000,000.

(B) Outlays, $89,764,000,000.

Fiscal year 2026:

(A) New budget authority, $67,633,000,000.

(B) Outlays, $80,552,000,000.

Fiscal year 2027:

(A) New budget authority, $45,140,000,000.

(B) Outlays, $75,844,000,000.

Fiscal year 2028:

(A) New budget authority, $45,985,000,000.

(B) Outlays, $71,673,000,000.

Fiscal year 2029:

(A) New budget authority, $46,956,000,000.

(B) Outlays, $67,691,000,000.

Fiscal year 2030:

(A) New budget authority, $47,707,000,000.

(B) Outlays, $63,948,000,000.

Fiscal year 2031:

(A) New budget authority, $48,854,000,000.

(B) Outlays, $60,580,000,000.

Fiscal year 2032:

(A) New budget authority, $49,918,000,000.

(B) Outlays, $56,444,000,000.

Fiscal year 2033:

(A) New budget authority, $51,246,000,000.

(B) Outlays, $55,797,000,000.

Fiscal year 2034:

(A) New budget authority, $52,225,000,000.

(B) Outlays, $55,480,000,000.

(6) Agriculture (350):

Fiscal year 2025:

(A) New budget authority, $58,457,000,000.

(B) Outlays, $41,846,000,000.

Fiscal year 2026:

(A) New budget authority, $28,163,000,000.

(B) Outlays, $46,212,000,000.

Fiscal year 2027:

(A) New budget authority, $31,716,000,000.

(B) Outlays, $33,686,000,000.

Fiscal year 2028:

(A) New budget authority, $33,008,000,000.

(B) Outlays, $34,426,000,000.

Fiscal year 2029:

(A) New budget authority, $33,334,000,000.

(B) Outlays, $32,441,000,000.

Fiscal year 2030:

(A) New budget authority, $30,857,000,000.

(B) Outlays, $30,098,000,000.

Fiscal year 2031:

(A) New budget authority, $30,468,000,000.

(B) Outlays, $29,609,000,000.

Fiscal year 2032:

(A) New budget authority, $31,239,000,000.

(B) Outlays, $30,163,000,000.

Fiscal year 2033:

(A) New budget authority, $32,276,000,000.

(B) Outlays, $30,893,000,000.

Fiscal year 2034:

(A) New budget authority, $32,912,000,000.

(B) Outlays, $31,721,000,000.

(7) Commerce and Housing Credit (370):

Fiscal year 2025:

(A) New budget authority, $12,477,000,000.

(B) Outlays, −$18,175,000,000.

Fiscal year 2026:

(A) New budget authority, $32,747,000,000.

(B) Outlays, −$626,000,000.

Fiscal year 2027:

(A) New budget authority, $28,145,000,000.

(B) Outlays, $7,710,000,000.

Fiscal year 2028:

(A) New budget authority, −$56,796,000,000.

(B) Outlays, −$65,194,000,000.

Fiscal year 2029:

(A) New budget authority, $25,562,000,000.

(B) Outlays, $15,976,000,000.

Fiscal year 2030:

(A) New budget authority, $25,712,000,000.

(B) Outlays, $12,680,000,000.

Fiscal year 2031:

(A) New budget authority, $25,941,000,000.

(B) Outlays, $7,932,000,000.

Fiscal year 2032:

(A) New budget authority, $26,354,000,000.

(B) Outlays, $5,060,000,000.

Fiscal year 2033:

(A) New budget authority, $20,192,000,000.

(B) Outlays, −$4,224,000,000.

Fiscal year 2034:

(A) New budget authority, $29,862,000,000.

(B) Outlays, $2,451,000,000.

(8) Transportation (400):

Fiscal year 2025:

(A) New budget authority, $173,158,000,000.

(B) Outlays, $144,771,000,000.

Fiscal year 2026:

(A) New budget authority, $167,673,000,000.

(B) Outlays, $152,541,000,000.

Fiscal year 2027:

(A) New budget authority, $132,085,000,000.

(B) Outlays, $158,068,000,000.

Fiscal year 2028:

(A) New budget authority, $133,386,000,000.

(B) Outlays, $162,528,000,000.

Fiscal year 2029:

(A) New budget authority, $134,447,000,000.

(B) Outlays, $160,846,000,000.

Fiscal year 2030:

(A) New budget authority, $129,994,000,000.

(B) Outlays, $150,790,000,000.

Fiscal year 2031:

(A) New budget authority, $130,964,000,000.

(B) Outlays, $147,539,000,000.

Fiscal year 2032:

(A) New budget authority, $138,846,000,000.

(B) Outlays, $150,163,000,000.

Fiscal year 2033:

(A) New budget authority, $140,544,000,000.

(B) Outlays, $149,247,000,000.

Fiscal year 2034:

(A) New budget authority, $142,271,000,000.

(B) Outlays, $149,454,000,000.

(9) Community and Regional Development (450):

Fiscal year 2025:

(A) New budget authority, $90,242,000,000.

(B) Outlays, $78,592,000,000.

Fiscal year 2026:

(A) New budget authority, $20,135,000,000.

(B) Outlays, $64,267,000,000.

Fiscal year 2027:

(A) New budget authority, $19,259,000,000.

(B) Outlays, $56,506,000,000.

Fiscal year 2028:

(A) New budget authority, $19,462,000,000.

(B) Outlays, $45,101,000,000.

Fiscal year 2029:

(A) New budget authority, $19,888,000,000.

(B) Outlays, $35,976,000,000.

Fiscal year 2030:

(A) New budget authority, $20,326,000,000.

(B) Outlays, $31,026,000,000.

Fiscal year 2031:

(A) New budget authority, $20,727,000,000.

(B) Outlays, $27,543,000,000.

Fiscal year 2032:

(A) New budget authority, $21,007,000,000.

(B) Outlays, $24,658,000,000.

Fiscal year 2033:

(A) New budget authority, $21,462,000,000.

(B) Outlays, $22,754,000,000.

Fiscal year 2034:

(A) New budget authority, $21,864,000,000.

(B) Outlays, $21,733,000,000.

(10) Education, Training, Employment, and Social Services (500):

Fiscal year 2025:

(A) New budget authority, $149,379,000,000.

(B) Outlays, $171,920,000,000.

Fiscal year 2026:

(A) New budget authority, $152,714,000,000.

(B) Outlays, $151,639,000,000.

Fiscal year 2027:

(A) New budget authority, $155,152,000,000.

(B) Outlays, $151,206,000,000.

Fiscal year 2028:

(A) New budget authority, $157,970,000,000.

(B) Outlays, $152,914,000,000.

Fiscal year 2029:

(A) New budget authority, $160,942,000,000.

(B) Outlays, $155,518,000,000.

Fiscal year 2030:

(A) New budget authority, $163,842,000,000.

(B) Outlays, $158,366,000,000.

Fiscal year 2031:

(A) New budget authority, $166,812,000,000.

(B) Outlays, $161,277,000,000.

Fiscal year 2032:

(A) New budget authority, $170,169,000,000.

(B) Outlays, $164,438,000,000.

Fiscal year 2033:

(A) New budget authority, $173,711,000,000.

(B) Outlays, $167,726,000,000.

Fiscal year 2034:

(A) New budget authority, $176,750,000,000.

(B) Outlays, $170,798,000,000.

(11) Health (550):

Fiscal year 2025:

(A) New budget authority, $948,957,000,000.

(B) Outlays, $963,482,000,000.

Fiscal year 2026:

(A) New budget authority, $992,092,000,000.

(B) Outlays, $977,707,000,000.

Fiscal year 2027:

(A) New budget authority, $1,020,326,000,000.

(B) Outlays, $1,021,663,000,000.

Fiscal year 2028:

(A) New budget authority, $1,054,949,000,000.

(B) Outlays, $1,051,917,000,000.

Fiscal year 2029:

(A) New budget authority, $1,098,389,000,000.

(B) Outlays, $1,093,560,000,000.

Fiscal year 2030:

(A) New budget authority, $1,142,669,000,000.

(B) Outlays, $1,132,096,000,000.

Fiscal year 2031:

(A) New budget authority, $1,176,497,000,000.

(B) Outlays, $1,175,451,000,000.

Fiscal year 2032:

(A) New budget authority, $1,226,824,000,000.

(B) Outlays, $1,216,998,000,000.

Fiscal year 2033:

(A) New budget authority, $1,276,881,000,000.

(B) Outlays, $1,266,068,000,000.

Fiscal year 2034:

(A) New budget authority, $1,310,000,000,000.

(B) Outlays, $1,298,975,000,000.

(12) Medicare (570):

Fiscal year 2025:

(A) New budget authority, $952,239,000,000.

(B) Outlays, $951,989,000,000.

Fiscal year 2026:

(A) New budget authority, $1,007,093,000,000.

(B) Outlays, $1,008,459,000,000.

Fiscal year 2027:

(A) New budget authority, $1,066,571,000,000.

(B) Outlays, $1,066,331,000,000.

Fiscal year 2028:

(A) New budget authority, $1,209,735,000,000.

(B) Outlays, $1,208,675,000,000.

Fiscal year 2029:

(A) New budget authority, $1,125,645,000,000.

(B) Outlays, $1,125,301,000,000.

Fiscal year 2030:

(A) New budget authority, $1,275,864,000,000.

(B) Outlays, $1,275,627,000,000.

Fiscal year 2031:

(A) New budget authority, $1,357,791,000,000.

(B) Outlays, $1,357,726,000,000.

Fiscal year 2032:

(A) New budget authority, $1,445,195,000,000.

(B) Outlays, $1,445,191,000,000.

Fiscal year 2033:

(A) New budget authority, $1,659,329,000,000.

(B) Outlays, $1,659,346,000,000.

Fiscal year 2034:

(A) New budget authority, $1,666,492,000,000.

(B) Outlays, $1,666,497,000,000.

(13) Income Security (600):

Fiscal year 2025:

(A) New budget authority, $712,538,000,000.

(B) Outlays, $709,200,000,000.

Fiscal year 2026:

(A) New budget authority, $691,755,000,000.

(B) Outlays, $690,914,000,000.

Fiscal year 2027:

(A) New budget authority, $708,645,000,000.

(B) Outlays, $703,648,000,000.

Fiscal year 2028:

(A) New budget authority, $727,434,000,000.

(B) Outlays, $727,234,000,000.

Fiscal year 2029:

(A) New budget authority, $728,925,000,000.

(B) Outlays, $714,850,000,000.

Fiscal year 2030:

(A) New budget authority, $748,162,000,000.

(B) Outlays, $739,465,000,000.

Fiscal year 2031:

(A) New budget authority, $760,737,000,000.

(B) Outlays, $751,498,000,000.

Fiscal year 2032:

(A) New budget authority, $778,878,000,000.

(B) Outlays, $768,898,000,000.

Fiscal year 2033:

(A) New budget authority, $800,142,000,000.

(B) Outlays, $796,835,000,000.

Fiscal year 2034:

(A) New budget authority, $808,455,000,000.

(B) Outlays, $798,159,000,000.

(14) Social Security (650):

Fiscal year 2025:

(A) New budget authority, $67,259,000,000.

(B) Outlays, $67,259,000,000.

Fiscal year 2026:

(A) New budget authority, $81,690,000,000.

(B) Outlays, $81,690,000,000.

Fiscal year 2027:

(A) New budget authority, $89,447,000,000.

(B) Outlays, $89,447,000,000.

Fiscal year 2028:

(A) New budget authority, $94,419,000,000.

(B) Outlays, $94,419,000,000.

Fiscal year 2029:

(A) New budget authority, $100,138,000,000.

(B) Outlays, $100,138,000,000.

Fiscal year 2030:

(A) New budget authority, $106,208,000,000.

(B) Outlays, $106,208,000,000.

Fiscal year 2031:

(A) New budget authority, $112,114,000,000.

(B) Outlays, $112,114,000,000.

Fiscal year 2032:

(A) New budget authority, $118,485,000,000.

(B) Outlays, $118,485,000,000.

Fiscal year 2033:

(A) New budget authority, $125,325,000,000.

(B) Outlays, $125,325,000,000.

Fiscal year 2034:

(A) New budget authority, $132,539,000,000.

(B) Outlays, $132,539,000,000.

(15) Veterans Benefits and Services (700):

Fiscal year 2025:

(A) New budget authority, $361,349,000,000.

(B) Outlays, $357,760,000,000.

Fiscal year 2026:

(A) New budget authority, $382,555,000,000.

(B) Outlays, $378,814,000,000.

Fiscal year 2027:

(A) New budget authority, $404,594,000,000.

(B) Outlays, $401,319,000,000.

Fiscal year 2028:

(A) New budget authority, $427,329,000,000.

(B) Outlays, $444,241,000,000.

Fiscal year 2029:

(A) New budget authority, $447,757,000,000.

(B) Outlays, $422,317,000,000.

Fiscal year 2030:

(A) New budget authority, $466,616,000,000.

(B) Outlays, $461,720,000,000.

Fiscal year 2031:

(A) New budget authority, $486,716,000,000.

(B) Outlays, $481,638,000,000.

Fiscal year 2032:

(A) New budget authority, $507,187,000,000.

(B) Outlays, $502,655,000,000.

Fiscal year 2033:

(A) New budget authority, $528,733,000,000.

(B) Outlays, $548,734,000,000.

Fiscal year 2034:

(A) New budget authority, $550,662,000,000.

(B) Outlays, $547,796,000,000.

(16) Administration of Justice (750):

Fiscal year 2025:

(A) New budget authority, $83,111,000,000.

(B) Outlays, $85,235,000,000.

Fiscal year 2026:

(A) New budget authority, $88,992,000,000.

(B) Outlays, $87,024,000,000.

Fiscal year 2027:

(A) New budget authority, $87,701,000,000.

(B) Outlays, $86,420,000,000.

Fiscal year 2028:

(A) New budget authority, $89,687,000,000.

(B) Outlays, $88,514,000,000.

Fiscal year 2029:

(A) New budget authority, $92,142,000,000.

(B) Outlays, $90,690,000,000.

Fiscal year 2030:

(A) New budget authority, $94,574,000,000.

(B) Outlays, $92,986,000,000.

Fiscal year 2031:

(A) New budget authority, $96,848,000,000.

(B) Outlays, $94,869,000,000.

Fiscal year 2032:

(A) New budget authority, $104,463,000,000.

(B) Outlays, $101,844,000,000.

Fiscal year 2033:

(A) New budget authority, $107,160,000,000.

(B) Outlays, $104,339,000,000.

Fiscal year 2034:

(A) New budget authority, $109,431,000,000.

(B) Outlays, $106,934,000,000.

(17) General Government (800):

Fiscal year 2025:

(A) New budget authority, $10,089,000,000.

(B) Outlays, $37,960,000,000.

Fiscal year 2026:

(A) New budget authority, $30,666,000,000.

(B) Outlays, $38,285,000,000.

Fiscal year 2027:

(A) New budget authority, $32,065,000,000.

(B) Outlays, $38,261,000,000.

Fiscal year 2028:

(A) New budget authority, $32,994,000,000.

(B) Outlays, $37,957,000,000.

Fiscal year 2029:

(A) New budget authority, $33,770,000,000.

(B) Outlays, $37,793,000,000.

Fiscal year 2030:

(A) New budget authority, $34,614,000,000.

(B) Outlays, $37,985,000,000.

Fiscal year 2031:

(A) New budget authority, $35,247,000,000.

(B) Outlays, $37,024,000,000.

Fiscal year 2032:

(A) New budget authority, $36,189,000,000.

(B) Outlays, $36,307,000,000.

Fiscal year 2033:

(A) New budget authority, $36,960,000,000.

(B) Outlays, $36,758,000,000.

Fiscal year 2034:

(A) New budget authority, $37,681,000,000.

(B) Outlays, $37,266,000,000.

(18) Net Interest (900):

Fiscal year 2025:

(A) New budget authority, $1,011,643,000,000.

(B) Outlays, $1,011,643,000,000.

Fiscal year 2026:

(A) New budget authority, $1,031,561,000,000.

(B) Outlays, $1,031,561,000,000.

Fiscal year 2027:

(A) New budget authority, $1,078,839,000,000.

(B) Outlays, $1,078,839,000,000.

Fiscal year 2028:

(A) New budget authority, $1,150,343,000,000.

(B) Outlays, $1,150,343,000,000.

Fiscal year 2029:

(A) New budget authority, $1,213,150,000,000.

(B) Outlays, $1,213,150,000,000.

Fiscal year 2030:

(A) New budget authority, $1,269,439,000,000.

(B) Outlays, $1,269,439,000,000.

Fiscal year 2031:

(A) New budget authority, $1,332,808,000,000.

(B) Outlays, $1,332,808,000,000.

Fiscal year 2032:

(A) New budget authority, $1,398,649,000,000.

(B) Outlays, $1,398,649,000,000.

Fiscal year 2033:

(A) New budget authority, $1,457,676,000,000.

(B) Outlays, $1,457,676,000,000.

Fiscal year 2034:

(A) New budget authority, $1,525,604,000,000.

(B) Outlays, $1,525,604,000,000.

(19) Allowances (920):

Fiscal year 2025:

(A) New budget authority, −$1,009,217,000,000.

(B) Outlays, −$987,791,000,000.

Fiscal year 2026:

(A) New budget authority, −$888,800,000,000.

(B) Outlays, −$900,514,000,000.

Fiscal year 2027:

(A) New budget authority, −$890,385,000,000.

(B) Outlays, −$894,905,000,000.

Fiscal year 2028:

(A) New budget authority, −$848,052,000,000.

(B) Outlays, −$850,422,000,000.

Fiscal year 2029:

(A) New budget authority, −$851,534,000,000.

(B) Outlays, −$852,928,000,000.

Fiscal year 2030:

(A) New budget authority, −$874,353,000,000.

(B) Outlays, −$874,414,000,000.

Fiscal year 2031:

(A) New budget authority, −$874,523,000,000.

(B) Outlays, −$874,523,000,000.

Fiscal year 2032:

(A) New budget authority, −$894,135,000,000.

(B) Outlays, −$894,135,000,000.

Fiscal year 2033:

(A) New budget authority, −$940,797,000,000.

(B) Outlays, −$940,797,000,000.

Fiscal year 2034:

(A) New budget authority, −$913,790,000,000.

(B) Outlays, −$913,790,000,000.

(20) Undistributed Offsetting Receipts (950):

Fiscal year 2025:

(A) New budget authority, −$127,603,000,000.

(B) Outlays, −$127,603,000,000.

Fiscal year 2026:

(A) New budget authority, −$135,110,000,000.

(B) Outlays, −$135,110,000,000.

Fiscal year 2027:

(A) New budget authority, −$137,883,000,000.

(B) Outlays, −$137,883,000,000.

Fiscal year 2028:

(A) New budget authority, −$141,145,000,000.

(B) Outlays, −$141,165,000,000.

Fiscal year 2029:

(A) New budget authority, −$145,400,000,000.

(B) Outlays, −$145,407,000,000.

Fiscal year 2030:

(A) New budget authority, −$149,582,000,000.

(B) Outlays, −$149,581,000,000.

Fiscal year 2031:

(A) New budget authority, −$154,014,000,000.

(B) Outlays, −$154,013,000,000.

Fiscal year 2032:

(A) New budget authority, −$160,114,000,000.

(B) Outlays, −$160,113,000,000.

Fiscal year 2033:

(A) New budget authority, −$166,102,000,000.

(B) Outlays, −$166,101,000,000.

Fiscal year 2034:

(A) New budget authority, −$171,015,000,000.

(B) Outlays, −$171,014,000,000.

B Levels and amounts in the Senate

II Reconciliation

III Reserve funds

IV Other matters

V Policy statements in the House of Representatives